• Ferro-manganese Mn 65%min, C 7%max EXW China(350)  05-09|Silico-manganese 65/17 EXW China(400)  05-09|Ferro-manganese Mn 75%min, C 8%max EXW China(350)  05-09|Silico-manganese 60/14 EXW China(300)  05-09|Manganese Ore Gabonese 44%min In Qinzhou Port(2)  05-09|Manganese Ore Gabonese 44%min In Tianjin Port(2)  05-09|Manganese Ore Brazilian 44%min In Qinzhou Port(2)  05-09|Manganese Ore Australian 45%min In Qinzhou Port(2)  05-09|Manganese Ore Australian 45%min In Tianjin Port(2)  05-09|Manganese Ore Brazilian 44%min In Tianjin Port(2)  05-09|Manganese Ore Carbonate, Mn 13%min EXW China(1.3)  05-09|Manganese Sulfate Mn 32%min EXW China(200)  05-09|Manganese Ore S.A. 36%min In Qinzhou Port(1.5)  05-09|Manganese Ore S.A. 36%min In Tianjin Port(1.5)  05-09
  • Baowu Special Metallurgy begins steel ingot production at Ma'anshan project

    2023-11-02 11:53:21   [Print]
    Baowu special metallurgical material production base project (Ma'anshan project) started phase one production on November 1.Asian Metal Copyright2 billion USD301 million.Asian Metal Copyright The project, developed by Baowu Special Metallurgy (Ma'anshan) Gaojin Technology Co.Asian Metal Copyright .Asian Metal Copyright, Ltd.Asian Metal Copyright The project, developed by Baowu Special Metallurgy Ma'anshan Gaojin Technology Co.Asian Metal Copyright, consists of two phases, with a total investment of RMB2 billion (USD273 million).

    The phase one project, with total investment estimated at RMB1.2 billion (USD164 million), took just 14 months to finish construction and begin production.Asian Metal Copyright, Ltd.Asian Metal Copyright When reaching full capacity, the phase one would be able to produce 146,300 tonnes per annum of steel ingot with annual sales revenue of RMB2.Asian Metal Copyright, consists of two phases, with a total investment of RMB2 billion USD273 million.Asian Metal Copyright2 billion (USD301 million).

    .Asian Metal Copyright2 billion USD301 millionAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.