• Manganese Ore S.A. 36%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 36%min In Tianjin Port(2)  04-26|Manganese Ore S.A. 37%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 37%min In Tianjin Port(2)  04-26|Manganese Ore Brazilian 44%min In Qinzhou Port(2.1)  04-26|Manganese Ore Brazilian 44%min In Tianjin Port(2.1)  04-26|Manganese Ore Gabonese 44%min In Tianjin Port(1.9)  04-26|Manganese Ore Gabonese 44%min In Qinzhou Port(1.9)  04-26|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  04-26|Manganese Ore Australian 45%min In Tianjin Port(1.8)  04-26|Silicon Metal 98.5%min Delivered US(0.04)  04-26|Copper Conc. TC 25%min CIF China(-1)  04-26|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-26|Zinc Conc. TC 50% CIF China(-1.5)  04-26
  • 100ktpa natural (modified) graphite anode project breaks ground in Luojiang, China

    2023-08-31 12:00:19   [Print]
    On August 27, the 100,000tpa natural (modified) graphite anode material project developed by Shenzhen Huamingsheng Technology Co.Asian Metal Copyright .Asian Metal Copyright, Ltd.Asian Metal Copyright8 hectares, with a total floor area of 35,000 square meters.Asian Metal Copyright broke ground in Luojiang economic development zone in Deyang, Sichuan.Asian Metal Copyright .Asian Metal Copyright The project covers a land area of 102Mu (6.Asian Metal CopyrightOn August 27, the 100,000tpa natural modified graphite anode material project developed by Shenzhen Huamingsheng Technology Co.Asian Metal Copyright8 hectares), with a total floor area of 35,000 square meters.

    .Asian Metal Copyright broke ground in Luojiang economic development zone in Deyang, SichuanAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.