• Silico-manganese 65/17 EXW China(500)  05-08|Silico-manganese 60/14 EXW China(300)  05-08|Ammonium Metavanadate 98%min EXW China(3000)  05-08|Vanadium Pentoxide Powder 98%min EXW China(3000)  05-08|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  05-08|Manganese Ore Australian 45%min In Tianjin Port(1.8)  05-08|Manganese Ore Gabonese 44%min In Qinzhou Port(1.7)  05-08|Manganese Ore Gabonese 44%min In Tianjin Port(1.7)  05-08|Manganese Ore Brazilian 44%min In Qinzhou Port(1.7)  05-08|Manganese Ore Brazilian 44%min In Tianjin Port(1.7)  05-08|Manganese Ore S.A. 36%min In Qinzhou Port(1.5)  05-08|Manganese Ore S.A. 36%min In Tianjin Port(1.5)  05-08|Manganese Ore S.A. 37%min In Qinzhou Port(1.5)  05-08|Manganese Ore S.A. 37%min In Tianjin Port(1.5)  05-08
  • Pangang Group Vanadium & Titanium's subsidiary completes construction of V electrolyte production line

    2023-05-26 14:47:44   [Print]
    Recently, Pangang Group Vanadium & Titanium announced that by May 25, 2023 its controlled subsidiary Sichuan Fanrong Energy Storage Technology Co.Asian Metal Copyright already completed equipment installment and hot commissioning of its vanadium electrolyte production line and is undertaking trial production now.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright already completed equipment installment and hot commissioning of its vanadium electrolyte production line and is undertaking trial production now.

    .Asian Metal CopyrightRecently, Pangang Group Vanadium Titanium announced that by May 25, 2023 its controlled subsidiary Sichuan Fanrong Energy Storage Technology CoAsian Metal Copyright
    Vanadium Pentoxide Powder 99.5%min EXW China
    Unit:RMB/mt
    China vanadium nitride producers' suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.