• Selenium Dioxide 98%min Delivered China(5)  07-26|Arsenic Metal 99%min FOB China(-25)  07-26|Rhenium APR 99.99%min EXW China(140)  07-26|HR Strip Q195 295*2.5mm In warehouse Guangzhou(-100)  07-26|HR Strip Q195 685*2.75mm In warehouse Guangzhou(-100)  07-26|HR Strip Q195 295*2.5mm In warehouse Shanghai(-100)  07-26|HR Strip Q235B 685*5.5mm In warehouse Shanghai(-100)  07-26|Met. Coke A 13%max, S 0.7%max EXW Shanxi(-50)  07-26|Met. Coke A 13%max, S 0.7%max EXW Hebei(-50)  07-26|Met. Coke A 13%max, S 0.7%max EXW Shandong(-50)  07-26|Selenium Powder 99.9%min Delivered India(50)  07-26|Titanium Plate TA2 2mm EXW China(-2)  07-26|Ferro-silicon 65%min In warehouse Russia(-2)  07-26|Manganese Flake 99.7%min In warehouse Rotterdam(-50)  07-26
  • Gansu conducts massive safety inspection over mine operations

    2023-05-19 16:37:25   [Print]
    The Emergency Department of Gansu and the Gansu Bureau of the State Mine Bureau jointly decide to carry out special projects of massive and thorough safety inspection over all the mines in the province to avoid major and extra serious mine accidents.Asian Metal CopyrightThe Emergency Department of Gansu and the Gansu Bureau of the State Mine Bureau jointly decide to carry out special projects of massive and thorough safety inspection over all the mines in the province to avoid major and extra serious mine accidents.Asian Metal Copyright The special projects are designed to start from May and complete before late August, while the special projects for coal mines, open pits and tailing ponds will come to an end no later than late June.

    The special projects involve all of 85 coal mine enterprises, 168 metal and non-metal underground mines, 159 tailing ponds as well as 36 metal and non-metal open-pit mines with over-100-meter slopes. Other mines beyond the mentioned categories in the province are subject to overall inspection regulations made by the municipal and county emergency administrations on the basis of the principle of territory supervision.
    .Asian Metal Copyright The special projects are designed to start from May and complete before late August, while the special projects for coal mines, open pits and tailing ponds will come to an end no later than late JuneAsian Metal Copyright
    Magnesite Lump 47%min EXW China
    Unit:RMB/mt
    China caustic calcined magnesia producers' suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.