• Selenium Dioxide 98%min Delivered China(5)  07-26|Arsenic Metal 99%min FOB China(-25)  07-26|Rhenium APR 99.99%min EXW China(140)  07-26|HR Strip Q195 295*2.5mm In warehouse Guangzhou(-100)  07-26|HR Strip Q195 685*2.75mm In warehouse Guangzhou(-100)  07-26|HR Strip Q195 295*2.5mm In warehouse Shanghai(-100)  07-26|HR Strip Q235B 685*5.5mm In warehouse Shanghai(-100)  07-26|Met. Coke A 13%max, S 0.7%max EXW Shanxi(-50)  07-26|Met. Coke A 13%max, S 0.7%max EXW Hebei(-50)  07-26|Met. Coke A 13%max, S 0.7%max EXW Shandong(-50)  07-26|Selenium Powder 99.9%min Delivered India(50)  07-26|Titanium Plate TA2 2mm EXW China(-2)  07-26|Ferro-silicon 65%min In warehouse Russia(-2)  07-26|Manganese Flake 99.7%min In warehouse Rotterdam(-50)  07-26
  • Huangshi Xingang to add 2.25Mt steelmaking capacity through replacement program

    2023-03-23 15:43:35   [Print]
    In accordance with relevant guidelines and implementation measures issued by the State Council, the 2.Asian Metal Copyright will be made public by the Department of Economy and Information Technology of Hubei Province from March 21 to April 18, 2023.Asian Metal Copyright25Mt steelmaking capacity replacement scheme drawn up by Huangshi Xingang Heavy Industry Technology Co.Asian Metal Copyright25Mt steelmaking capacity replacement scheme drawn up by Huangshi Xingang Heavy Industry Technology Co.Asian Metal Copyright, Ltd.Asian Metal Copyright25 million tonnes per year through a capacity replacement program.Asian Metal Copyright will be made public by the Department of Economy and Information Technology of Hubei Province from March 21 to April 18, 2023.

    The company plans to add steelmaking capacity of 2.25 million tonnes per year through a capacity replacement program.Asian Metal Copyright The newly-planned capacity is expected to come on line in October 2024.Asian Metal Copyright The newly-planned capacity is expected to come on line in October 2024.

    .Asian Metal Copyright Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.