• Manganese Ore Gabonese 44%min In Tianjin Port(1.5)  04-19|Manganese Ore Australian 45%min In Qinzhou Port(1.5)  04-19|Manganese Ore Gabonese 44%min In Qinzhou Port(1.5)  04-19|Manganese Ore Brazilian 44%min In Tianjin Port(1.5)  04-19|Manganese Ore Australian 45%min In Tianjin Port(1.5)  04-19|Ferro-chrome Cr 60%min, C 0.1%max In warehouse Rotterdam(-0.1)  04-19|Manganese Ore S.A. 36%min In Tianjin Port(1.3)  04-19|Manganese Ore Brazilian 44%min In Qinzhou Port(1.3)  04-19|Manganese Sulfate Mn 32%min EXW China(150)  04-19|Copper Conc. 20%min Delivered China(2150)  04-19|Manganese Ore S.A. 36%min In Qinzhou Port(1)  04-19|Manganese Ore S.A. 37%min In Qinzhou Port(1)  04-19|Manganese Ore S.A. 37%min In Tianjin Port(1)  04-19|Indium Ingot 99.995%min EXW China(60)  04-19
  • Huangshi Xingang to add 2.25Mt steelmaking capacity through replacement program

    2023-03-23 15:43:35   [Print]
    In accordance with relevant guidelines and implementation measures issued by the State Council, the 2.Asian Metal Copyright, Ltd.Asian Metal Copyright25Mt steelmaking capacity replacement scheme drawn up by Huangshi Xingang Heavy Industry Technology Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright25Mt steelmaking capacity replacement scheme drawn up by Huangshi Xingang Heavy Industry Technology Co.Asian Metal Copyright will be made public by the Department of Economy and Information Technology of Hubei Province from March 21 to April 18, 2023.

    The company plans to add steelmaking capacity of 2.25 million tonnes per year through a capacity replacement program.Asian Metal Copyright, Ltd.Asian Metal Copyright The newly-planned capacity is expected to come on line in October 2024.

    .Asian Metal Copyright The company plans to add steelmaking capacity of 2Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.