• Manganese Ore S.A. 36%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 36%min In Tianjin Port(2)  04-26|Manganese Ore S.A. 37%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 37%min In Tianjin Port(2)  04-26|Manganese Ore Brazilian 44%min In Qinzhou Port(2.1)  04-26|Manganese Ore Brazilian 44%min In Tianjin Port(2.1)  04-26|Manganese Ore Gabonese 44%min In Qinzhou Port(1.9)  04-26|Manganese Ore Gabonese 44%min In Tianjin Port(1.9)  04-26|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  04-26|Manganese Ore Australian 45%min In Tianjin Port(1.8)  04-26|Silicon Metal 98.5%min Delivered US(0.04)  04-26|Copper Conc. TC 25%min CIF China(-1)  04-26|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-26|Zinc Conc. TC 50% CIF China(-1.5)  04-26
  • Jizhong Energy approved to raise production capacity in Inner Mongolia to 1500000tpy in 2023

    2023-03-22 15:29:46   [Print]
    Jizhong Energy announced recently that it's approved to raise its production capacity in Inner Mongolia to 1,500,000tpy in 2023, including 300,000tpy for Shengxin that was already approved in 2022, 900,000tpy for Jiaxinde and 300,000tpy for Jiadong, adding that the production capacity of 600,000tpy for its Xingtai Mining West Shaft is expected to go into operation in the second half of 2023.

    .Asian Metal CopyrightJizhong Energy announced recently that it's approved to raise its production capacity in Inner Mongolia to 1,500,000tpy in 2023, including 300,000tpy for Shengxin that was already approved in 2022, 900,000tpy for Jiaxinde and 300,000tpy for Jiadong, adding that the production capacity of 600,000tpy for its Xingtai Mining West Shaft is expected to go into operation in the second half of 2023Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.