• PrNd Mischmetal Pr 25%, Nd 75% EXW Chinaup(15000)  05-13|PrNd Oxide Pr6O11 25%, Nd2O3 75% EXW Chinaup(12000)  05-13|PrNd Mischmetal Pr 25%, Nd 75% FOB Chinaup(2)  05-13|Neodymium Oxide 99.5%min EXW Chinaup(12000)  05-13|Praseodymium Oxide 99.5%min FOB Chinaup(1700)  05-13|Bauxite Guinean 45%min CIF Chinadown(-2)  05-13|Tungsten Scrap CNC Cutting Blades 70%min Ex-VAT Delivered Chinaup(5)  05-13|Neodymium Oxide 99.5%min FOB Chinaup(1500)  05-13|Ferro-titanium 70%min Delivered USdown(-0.2)  05-13|Sodium Pyroantimonate 58.4% Delivered Chinadown(-3000)  05-13|Tungsten Scrap Drills 70%min Ex-VAT Delivered Chinaup(5)  05-13|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max FOB Chinadown(-0.2)  05-13|Praseodymium Oxide 99.5%min EXW Chinaup(10000)  05-13|Tungsten Scrap Anvil 90%min Ex-VAT Delivered Chinaup(5)  05-13
  • Zhonghong Kechuang's RMB5 billion energy storage project starts construction

    2023-02-23 15:14:08   [Print]
    On Feb 21, centralized starting events of major projects for 2023 were held in Zhejiang, during which Zhonghong Kechuang energy storage project in Chun 'an county was started too.Asian Metal Copyright5 billion USD508 million.Asian Metal Copyright The project includes four phases, of which the first and second phases will be implemented from 2023 to 2024, with a total investment of about RMB1.Asian Metal Copyright5 billion USD508 million.Asian Metal Copyright5 billion (USD218 million); the third and fourth phases will be implemented from 2024 to 2027, with a total investment of about 3.Asian Metal Copyright After construction, the project's energy storage system factory, energy storage cell factory and RD center will reach full production capacity within 6 years and will achieve an annual industrial sales value of no less than 20 billion USD2.Asian Metal Copyright5 billion (USD508 million).Asian Metal Copyright9 billion.Asian Metal Copyright After construction, the project's energy storage system factory, energy storage cell factory and R&D center will reach full production capacity within 6 years and will achieve an annual industrial sales value of no less than 20 billion (USD2.Asian Metal Copyright The project includes four phases, of which the first and second phases will be implemented from 2023 to 2024, with a total investment of about RMB1.Asian Metal Copyright9 billion).
    .Asian Metal Copyright After construction, the project's energy storage system factory, energy storage cell factory and RD center will reach full production capacity within 6 years and will achieve an annual industrial sales value of no less than 20 billion USD2Asian Metal Copyright
    Cobalt Oxide 72%min In warehouse Rotterdam
    Unit:EUR/kg
    Cobalt Oxide 72%min In warehouse Rotterdam EUR/kg
    China nickel cobalt manganese oxide producers' number MoM output increase statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.