• Manganese Ore S.A. 36%min In Qinzhou Port(2.5)  04-28|Manganese Ore S.A. 36%min In Tianjin Port(2.5)  04-28|Manganese Ore S.A. 37%min In Qinzhou Port(2.5)  04-28|Manganese Ore S.A. 37%min In Tianjin Port(2.5)  04-28|Manganese Ore Gabonese 44%min In Tianjin Port(2.5)  04-28|Manganese Ore Australian 45%min In Qinzhou Port(2.5)  04-28|Manganese Ore Gabonese 44%min In Qinzhou Port(2.5)  04-28|Manganese Ore Australian 45%min In Tianjin Port(2.5)  04-28|Manganese Ore Brazilian 44%min In Tianjin Port(2.5)  04-28|Manganese Ore Brazilian 44%min In Qinzhou Port(1.5)  04-28|Manganese Ore Carbonate, Mn 13%min EXW China(1)  04-28|Selenium Powder 99.9%min Delivered India(50)  04-28|Met. Coke A 13%max, S 0.7%max EXW Shanxi(50)  04-28|Copper Conc. TC 25%min CIF China(-1)  04-28
  • GCL System Integration's 20GW TOPCon cell project (Phase I) starts construction

    2023-02-23 15:03:02   [Print]
    On February 22, an opening ceremony for the major projects in the first quarter in Wanzhi District, Wuhu, including GCL System Integration's 20-gigawatt high-efficiency TOPCon photovoltaic cell manufacturing project (Phase I), was held officially.

    The project, with a total investment of RMB8 billion (USD1.16 billion), holds a total production capacity of 20 gigawatts which will be built by two phases.Asian Metal Copyright The first phase of 10 gigawatts will come into production by July 2023, and bring an annual output value of more than RMB10 billion USD1.Asian Metal Copyright The first phase of 10 gigawatts will come into production by July 2023, and bring an annual output value of more than RMB10 billion (USD1.Asian Metal CopyrightOn February 22, an opening ceremony for the major projects in the first quarter in Wanzhi District, Wuhu, including GCL System Integration's 20-gigawatt high-efficiency TOPCon photovoltaic cell manufacturing project Phase I, was held officially.Asian Metal Copyright45 billion) when it reaches full capacity.Asian Metal Copyright45 billion when it reaches full capacity.Asian Metal Copyright The second phase of 10 gigawatts will be constructed with funds through a private placement.
    .Asian Metal Copyright The project, with a total investment of RMB8 billion USD1Asian Metal Copyright
    Polysilicon 6N Delivered China
    Unit:RMB/kg
    China silicon metal producers' suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.