• Manganese Ore S.A. 36%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 36%min In Tianjin Port(2)  04-26|Manganese Ore S.A. 37%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 37%min In Tianjin Port(2)  04-26|Manganese Ore Brazilian 44%min In Qinzhou Port(2.1)  04-26|Manganese Ore Brazilian 44%min In Tianjin Port(2.1)  04-26|Manganese Ore Gabonese 44%min In Tianjin Port(1.9)  04-26|Manganese Ore Gabonese 44%min In Qinzhou Port(1.9)  04-26|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  04-26|Manganese Ore Australian 45%min In Tianjin Port(1.8)  04-26|Silicon Metal 98.5%min Delivered US(0.04)  04-26|Copper Conc. TC 25%min CIF China(-1)  04-26|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-26|Zinc Conc. TC 50% CIF China(-1.5)  04-26
  • Xinyi Silicon starts building 200,000tpy polysilicon project (phase one)

    2023-02-06 12:00:24   [Print]
    A ceremony was held formally on February 1st to launch the construction of Xinyi Group Yunnan Qujing Polysilicon Phase One Project.Asian Metal CopyrightA ceremony was held formally on February 1st to launch the construction of Xinyi Group Yunnan Qujing Polysilicon Phase One Project.Asian Metal Copyright With a total investment of about RMB20 billion (USD2.Asian Metal Copyright The phase one project has a total investment of around RMB6 billion USD884.Asian Metal Copyright95 billion), the project covers about 1,720,000 square meters, plans to build production lines for 200,000tpy of polysilicon and their supporting production lines for 20,000tpy of silica, and are divided into three phases in construction.Asian Metal Copyright96 million, covers about 530,000 square meters and is designed to build production lines for 60,000tpy of electronic grade polysilicon and their supporting production lines for 10,000tpy of silica with a construction period of six-nine months.Asian Metal Copyright The phase one project has a total investment of around RMB6 billion (USD884.Asian Metal Copyright95 billion, the project covers about 1,720,000 square meters, plans to build production lines for 200,000tpy of polysilicon and their supporting production lines for 20,000tpy of silica, and are divided into three phases in construction.Asian Metal Copyright96 million), covers about 530,000 square meters and is designed to build production lines for 60,000tpy of electronic grade polysilicon and their supporting production lines for 10,000tpy of silica with a construction period of six-nine months.



    .Asian Metal Copyright The phase one project has a total investment of around RMB6 billion USD884Asian Metal Copyright
    Polysilicon 6N Delivered China
    Unit:RMB/kg
    China silicon metal producers' suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.