• Copper Conc. TC 25%min CIF Chinadown(-3)  06-13|Wire Rod SAE1008 5.5mm In warehouse Kuala Lumpurdown(-70)  06-13|Cobalt Oxide 72%min In warehouse Rotterdamdown(-0.6)  06-13|Ferro-titanium 70%min EXW Indiadown(-10)  06-13|Tantalum Metal 99.95%min Delivered USup(10)  06-13|Silicon Carbide Black 98%min F16-100 FOB Chinadown(-30)  06-13|Selenium Dioxide 98%min Delivered Chinadown(-3)  06-13|Antimony Trioxide 99.5%min In warehouse Baltimoreup(0.8)  06-13|Silicon Carbide Black 98%min F16-100 EXW Chinadown(-200)  06-13|Ferro-titanium 70%min Delivered USdown(-0.2)  06-13|Silicon Carbide Black 88%min 0-10mm In warehouse Rotterdamdown(-20)  06-13|Silicon Carbide Black 88%min 0-10mm EXW Chinadown(-100)  06-13|Zirconium Silicate Zr(Hf)O2 64.5%min EXW Chinadown(-300)  06-13|Tellurium Metal 99.9%min In warehouse Rotterdamup(2)  06-13
  • Arctech gets super large order of 2.8GW from India

    2022-12-21 16:11:27   [Print]
    Suzhou Arctech New Energy Power Technology Co.Asian Metal Copyright The new project is located in the desert area on the border of India and Pakistan, with sufficient sunlight resources.Asian Metal Copyright, Ltd.Asian Metal Copyright8GW recently with the largest project developer of Gujarat in India.Asian Metal Copyright signed a supply agreement for Skyline II Tracking System of 2.Asian Metal Copyright signed a supply agreement for Skyline II Tracking System of 2.Asian Metal Copyright8GW recently with the largest project developer of Gujarat in India.Asian Metal CopyrightSuzhou Arctech New Energy Power Technology Co.Asian Metal Copyright This is another super large order signed by Arctech after winning the 2.Asian Metal Copyright The new project is located in the desert area on the border of India and Pakistan, with sufficient sunlight resources.Asian Metal Copyright1GW project in Abu Dhabi last year.Asian Metal CopyrightSuzhou Arctech New Energy Power Technology Co.Asian Metal Copyright The new project is located in the desert area on the border of India and Pakistan, with sufficient sunlight resources.Asian Metal Copyright The signing of a 2.Asian Metal Copyright The project is expected to be connected to the grid in the third quarter of 2023, and will become the largest photovoltaic power station in India after the construction is completed.Asian Metal Copyright8GW super large order makes Arctech's photovoltaic bracket sales in the Indian market reach 7GW.Asian Metal Copyright The signing of a 2.Asian Metal Copyright .Asian Metal Copyright8GW super large order makes Arctech's photovoltaic bracket sales in the Indian market reach 7GW.

    .Asian Metal Copyright The project is expected to be connected to the grid in the third quarter of 2023, and will become the largest photovoltaic power station in India after the construction is completedAsian Metal Copyright
    Silicon Metal 4-4-1 Delivered Europe
    Unit:EUR/mt
    Silicon Metal 4-4-1 Delivered Europe EUR/mt
    China silicon metal producers' number MoM output increase statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.