• Spodumene Li2O 3%min In port Chinaup(25)  08-08|Terbium Oxide 99.99%min In Warehouse Rotterdamup(100)  08-08|Ferro-silicon 75%min In warehouse Pittsburghup(0.03)  08-08|Spodumene Li2O 5%min In port Chinaup(30)  08-08|Lithium Manganate Mn 58% Delivered Chinaup(800)  08-08|Rhenium APR 99.99%min EXW Chinaup(300)  08-08|Lithium Carbonate 99.2%min Delivered Chinaup(2000)  08-08|Lithium Metal 99%min Delivered Chinaup(15000)  08-08|Selenium Powder 99.9%min Delivered Chinaup(5)  08-08|Lithium Carbonate 99.5%min Delivered Chinaup(2000)  08-08|Yttrium Oxide 99.999%min In warehouse Rotterdamup(1.5)  08-08|Yttrium Oxide 99.999%min FOB Chinaup(0.3)  08-08|Ferro-tungsten 75%min FOB Chinaup(1.5)  08-08|Spodumene Li2O 6%min CIF Chinaup(20)  08-08
  • Jilin Xinda Steel announces ironmaking capacity replacement scheme (Phase I)

    2022-10-12 15:48:07   [Print]
    The iron-making capacity replacement scheme (Phase I) proposed by Jilin Xinda Steel Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright55Mtpy.Asian Metal Copyright was recently released by the Industry and Information Technology Department of Jilin Province and it will be made public from October 11 to November 7, 2022.

    According to the scheme, the company plans to build two blast furnaces, with capacity of 2.38Mtpy to replace three existing blast furnaces to be shut down, with combined capacity of 2.Asian Metal Copyright38Mtpy to replace three existing blast furnaces to be shut down, with combined capacity of 2.Asian Metal Copyright55Mtpy.

    .Asian Metal Copyright55MtpyAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.