• Ferro-manganese Mn 65%min, C 7%max EXW China(200)  04-30|Ferro-manganese Mn 75%min, C 8%max EXW China(200)  04-30|Silico-manganese 65/17 EXW China(200)  04-30|Copper Conc. TC 25%min CIF China(-1)  04-30|Zinc Conc. 50%min EXW North China(480)  04-30|Ferro-silicon 75%min EXW China(200)  04-30|Zinc Conc. 50%min EXW South China(480)  04-30|Selenium Powder 99.9%min Delivered India(50)  04-30|Ferro-chrome Cr 60%min, C 8%max In warehouse Pittsburg(-0.05)  04-30|Zinc Ingot 99.99%min EXW China (600)  04-30|Zinc Ingot 99.995%min In warehouse Tianjin(600)  04-30|Zinc Ingot 99.995%min In warehouse Shanghai(600)  04-30|Zinc Ingot 99.995%min In warehouse Guangzhou(600)  04-30|Ferro-manganese Mn 75%min, C 2%max EXW China(200)  04-30
  • Drinda expects TOPCon product shipments to exceed 2GW in 2022

    2022-09-06 15:09:33   [Print]
    On September 5, Hainan Drinda Automotive Trim Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright revealed that the company expects to ship more than 2 gigawatts of TOPCon products and more than 8.Asian Metal Copyright revealed that the company expects to ship more than 2 gigawatts of TOPCon products and more than 8.Asian Metal Copyright5 gigawatts of PERC products this year, and the shipments would grow in pace with the company's production capacity expansion next year.Asian Metal Copyright5 gigawatts of PERC products this year, and the shipments would grow in pace with the company's production capacity expansion next year.
    .Asian Metal Copyright, LtdAsian Metal Copyright
    Polysilicon 6N Delivered China
    Unit:RMB/kg
    China silicon metal producers' suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.