• Lithium Carbonate 99.5%min Delivered Chinaup(3800)  08-13|Lithium Carbonate 99.2%min Delivered Chinaup(3400)  08-13|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinaup(3000)  08-13|Spodumene Li2O 6%min CIF Chinaup(30)  08-13|Spodumene Li2O 3%min In port Chinaup(30)  08-13|Spodumene Li2O 5%min In port Chinaup(35)  08-13|Rhenium APR 99.99%min EXW Chinaup(300)  08-13|Lithium Manganate Mn 58% Delivered Chinaup(800)  08-13|Yttrium Oxide 99.999%min In warehouse Rotterdamup(1.5)  08-13|Ferro-tungsten 75%min FOB Chinaup(1.5)  08-13|Rebar BS4449 GR500 16mm In warehouse Kuala Lumpurup(50)  08-13|Rebar BS4449 GR500 12mm In warehouse Kuala Lumpurup(50)  08-13|Silicon Metal 5-5-3 Delivered Europeup(30)  08-13|Germanium Dioxide 99.99%min Delivered USup(50)  08-13
  • Liaoning strives to achieve wind power and photovoltaic installed capacity of more than 37GW during 14th five-year plan

    2022-07-18 17:36:22   [Print]
    On July 14, Liaoning Government issued the energy development plan for the province during the 14th five-year plan.Asian Metal Copyright All coal-fired units shall meet ultra-low emission standards.Asian Metal Copyright According to the plan, non-fossil energy will contribute more increase in energy consumption, accounting for 13.Asian Metal Copyright Non-fossil energy will become the main power, accounting for more than 50% of the total power generation, and the power generation proportion of non-fossil energy will increase to about 47%.Asian Metal Copyright7% of the total.Asian Metal Copyright The proportion of clean coal utilization will reach about 45%.Asian Metal Copyright Non-fossil energy will become the main power, accounting for more than 50% of the total power generation, and the power generation proportion of non-fossil energy will increase to about 47%.Asian Metal CopyrightOn July 14, Liaoning Government issued the energy development plan for the province during the 14th five-year plan.Asian Metal Copyright The installed capacity of wind power and photovoltaic will reach over 37GW.Asian Metal Copyright The installed capacity of wind power and photovoltaic will reach over 37GW.Asian Metal Copyright All coal-fired units shall meet ultra-low emission standards.Asian Metal Copyright The installed capacity of wind power and photovoltaic will reach over 37GW.Asian Metal Copyright The proportion of clean coal utilization will reach about 45%.

    .Asian Metal Copyright The proportion of clean coal utilization will reach about 45%Asian Metal Copyright
    Silicon Powder 99%min Delivered China
    Unit:RMB/mt
    Silicon Powder 99%min Delivered China RMB/mt
    China silicon metal producers' inventory statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.