• Tellurium Metal 99.99%min EXW Chinaup(20)  10-24|Erbium Oxide 99.5%min FOB Chinaup(1.5)  10-24|Lithium Cobaltate Co 60%min Delivered Chinaup(10)  10-24|NCM 523 Delivered Chinaup(2700)  10-24|Cobalt Oxide 72%min In warehouse Rotterdamup(0.9)  10-24|LNCMO 8312 PC Delivered Chinaup(5)  10-24|NCM 613 Delivered Chinaup(2500)  10-24|NCM 8312 Delivered Chinaup(3000)  10-24|LNCMO 613 PC Delivered Chinaup(4)  10-24|Cobalt Tetroxide 73.5%min Delivered Chinaup(9)  10-24|Cobalt Metal 99.8%min Delivered Chinadown(-11)  10-24|Praseodymium Oxide 99.5%min In warehouse Rotterdamup(2)  10-24|LNCMO 523 PC Delivered Chinaup(4)  10-24|Erbium Oxide 99.5%min In warehouse Rotterdamup(1.5)  10-24
  • Rio Tinto starts tellurium production at Kennecott copper operation

    2022-05-13 15:23:19   [Print]
    Rio Tinto has started producing tellurium at its Kennecott copper operation in Utah, becoming one of only two US producers of the critical mineral used in advanced thin film photovoltaic solar panels.

    The tellurium will be refined in North America by 5N Plus, a global producer of specialty semiconductors and performance materials, under a commercial agreement between 5N Plus and Rio Tinto. The refined tellurium will primarily be supplied to First Solar under an existing supply contract.

    Approximately 20 US tons (18 tonnes) of tellurium will be produced per year through a new $2.9 million circuit built at the Kennecott refinery.
    .Asian Metal CopyrightRio Tinto has started producing tellurium at its Kennecott copper operation in Utah, becoming one of only two US producers of the critical mineral used in advanced thin film photovoltaic solar panelsAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.