• Tin Conc. Burmese 20%min In warehouse MengA(-7000)  04-24|Tin Conc. Burmese 30%min In warehouse MengA(-7000)  04-24|Molybdenum Conc. 45%min EXW China(100)  04-24|Met. Coke A 13%max, S 0.7%max EXW Shanxi(50)  04-24|Molybdenum Oxide 50%min EXW China(100)  04-24|Erbium Oxide 99.5%min FOB China(1.2)  04-24|Cobalt Intermediate 30-40% CIF China(-0.2)  04-24|Ferro-manganese Mn 65%min, C 7%max EXW China(150)  04-24|Met. Coke A 13%max, S 0.7%max EXW Hebei(50)  04-24|Tin Conc. 60%min Delivered China(-7000)  04-24|Met. Coke A 13%max, S 0.7%max EXW Shandong(50)  04-24|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-24|Ferro-molybdenum 60%min EXW China(6000)  04-24|Erbium Oxide 99.5%min EXW China(8)  04-24
  • Tangshan Songting's iron capacity replacement scheme publicized

    2021-12-07 15:24:05   [Print]
    In accordance with the requirements of guiding opinions and measures issued by the State Council regarding overcapacity and capacity replacement, the capacity replacement scheme of the ironmaking construction project of Tangshan Songting Iron & Steel Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright Tangshan Songting Iron Steel Co.Asian Metal Copyright is now continuously publicized.Asian Metal Copyright 4# 580 m3 blast furnace 68 Jun 1, 2020 Jun 30, 2020 3 Langfang Hebei Qianjin Steel Group Co.Asian Metal Copyright The publicity period is from December 6, 2021 to December 31, 2021.

    Projects in construction

    Company

    Construction site

    Smelting equipment (name, type and quantity)

    Production capacity (10kt)

    Construction starts on

    Production starts on

    Replacement ratio

    Tangshan Songting Iron & Steel Co., Ltd.

    Tangshan Songting Iron & Steel Co., Ltd.

    1×1,550m3 blast furnace

    133

    Jun 1, 2020

    Jun 30, 2020

    1.25:1

    Projects closed

    No.

    Province (district, city)

    Company

    Smelting equipment (name, type and quantity)

    Production capacity (10kt)

    Dismantling starting date

    Dismantling finish date

    Remarks

    1

    Tangshan

    Tangshan Songting Iron & Steel Co., Ltd.

    3# 580 m3 blast furnace

    68

    Jun 1, 2020

    Jun 30, 2020

     

    2

    Tangshan

    Tangshan Songting Iron & Steel Co., Ltd.

    4# 580 m3 blast furnace

    68

    Jun 1, 2020

    Jun 30, 2020

     

    3

    Langfang

    Hebei Qianjin Steel Group Co., Ltd

    1# 450 m3 blast furnace

    30.25

    Jun 1, 2020

    Jun 30, 2020

    330,000tpy capacity in total; 302,500tpy for replacement; 27,500tpy for future capacity replacement

    Total

     

     

     

    166.25

     

     

     



    .Asian Metal Copyright, LtdAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.