HEC to invest low-carbon battery aluminum foil project in Yidu
2021-12-01 15:34:06
[Print]
On November 29, HEC announced RMB6 billion (USD0.Asian Metal Copyright94 billion investment for a low-carbon battery aluminum foil project to be built in Yidu, Hubei province.Asian Metal Copyright94 billion) investment for a low-carbon battery aluminum foil project to be built in Yidu, Hubei province.Asian Metal Copyright
.Asian Metal Copyright The project will cover a planned land area of 1,200 Mu (80 hectares) and have an annual production capacity of 200,000t of low-carbon battery aluminum foil.Asian Metal Copyright The project will cover a planned land area of 1,200 Mu 80 hectares and have an annual production capacity of 200,000t of low-carbon battery aluminum foil.Asian Metal Copyright When going into operation, it is expected to generate an annual production value of RMB8 billion (USD1.Asian Metal Copyright26 billion and taxation of RMB500 million USD78.Asian Metal Copyright26 billion) and taxation of RMB500 million (USD78.Asian Metal Copyright
.Asian Metal Copyright57 million).
.Asian Metal CopyrightOn November 29, HEC announced RMB6 billion USD0Asian Metal Copyright
Aluminum Bar TC 6063 120mm In warehouse Foshan
Unit:RMB/mt
Africa bauxite producers' suspension number statistics by country by month
Unit: pcs