• Antimony Trioxide 99.5%min In warehouse Baltimoreup(0.8)  05-09|Silicon Metal 5-5-3 Delivered Europedown(-50)  05-09|Spodumene Li2O 6%min CIF Chinadown(-20)  05-09|Manganese Ore Australian 45%min In Tianjin Portdown(-1)  05-09|Spodumene Li2O 3%min In port Chinadown(-20)  05-09|Silicon Metal 4-4-1 Delivered Europedown(-50)  05-09|Antimony Ingot 99.65%min In warehouse Rotterdamup(1500)  05-09|Terbium Metal 99.9%min FOB Chinaup(30)  05-09|Dysprosium Oxide 99.5%min EXW Chinaup(40)  05-09|Manganese Ore Brazilian 44%min In Qinzhou Portdown(-1)  05-09|Ferro-titanium 70%min Delivered USdown(-0.2)  05-09|Manganese Ore 38%min FOB S.A. up(0.07)  05-09|Terbium Metal 99.9%min EXW Chinaup(200)  05-09|Stainless Bar 304 60mm In warehouse Dainandown(-300)  05-09
  • Angang Group's Zhoukou capacity replacement project Phase I ignites blast furnace

    2021-05-19 10:55:37   [Print]
    On May 18, with the successful ignition of No.Asian Metal CopyrightOn May 18, with the successful ignition of No.Asian Metal Copyright 1 blast furnace in the first phase of Angang Group's Zhoukou capacity replacement project, the project entered the full production stage, starting a new chapter in the layout optimization and transformation and upgrading of the iron and steel industry in Henan.
    .Asian Metal CopyrightOn May 18, with the successful ignition of NoAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.