• Spodumene Li2O 3%min In port Chinaup(25)  08-08|Terbium Oxide 99.99%min In Warehouse Rotterdamup(100)  08-08|Ferro-silicon 75%min In warehouse Pittsburghup(0.03)  08-08|Spodumene Li2O 5%min In port Chinaup(30)  08-08|Lithium Manganate Mn 58% Delivered Chinaup(800)  08-08|Rhenium APR 99.99%min EXW Chinaup(300)  08-08|Lithium Carbonate 99.2%min Delivered Chinaup(2000)  08-08|Lithium Metal 99%min Delivered Chinaup(15000)  08-08|Selenium Powder 99.9%min Delivered Chinaup(5)  08-08|Lithium Carbonate 99.5%min Delivered Chinaup(2000)  08-08|Yttrium Oxide 99.999%min In warehouse Rotterdamup(1.5)  08-08|Yttrium Oxide 99.999%min FOB Chinaup(0.3)  08-08|Ferro-tungsten 75%min FOB Chinaup(1.5)  08-08|Spodumene Li2O 6%min CIF Chinaup(20)  08-08
  • HBIS Group Wusteel steel-making plant ignites 1,260-cubic-meter blast furnace

    2021-05-10 11:02:25   [Print]
    At 11:16 of May 7, HBIS Group Wusteel steel-making plant successfully ignited its 1,260-cubic-meter blast furnace, marking that the plant completed a 22-day concentrated overhaul.
    .Asian Metal Copyright Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.