• Ferro-manganese Mn 65%min, C 7%max EXW China(200)  04-30|Ferro-manganese Mn 75%min, C 8%max EXW China(200)  04-30|Silico-manganese 65/17 EXW China(200)  04-30|Copper Conc. TC 25%min CIF China(-1)  04-30|Zinc Conc. 50%min EXW North China(480)  04-30|Ferro-silicon 75%min EXW China(200)  04-30|Zinc Conc. 50%min EXW South China(480)  04-30|Selenium Powder 99.9%min Delivered India(50)  04-30|Ferro-chrome Cr 60%min, C 8%max In warehouse Pittsburg(-0.05)  04-30|Zinc Ingot 99.99%min EXW China (600)  04-30|Zinc Ingot 99.995%min In warehouse Shanghai(600)  04-30|Zinc Ingot 99.995%min In warehouse Tianjin(600)  04-30|Zinc Ingot 99.995%min In warehouse Guangzhou(600)  04-30|Ferro-manganese Mn 75%min, C 2%max EXW China(200)  04-30
  • Rizhao plans to build iron and steel production and smelting park with capacity of 40 million tons

    2021-05-06 15:16:13   [Print]
    Recently, the Bureau of Industry and Information Technology of Rizhao secondly issued the environmental impact assessment for the plan of building production and smelting park of an advanced iron and steel manufacturing base in Rizhao and wanted to seek public opinions.Asian Metal Copyright .Asian Metal Copyright Rizhao made this plan in 2019 and expected the construction period would start in 2020 and end in 2025.Asian Metal Copyright In the short-term period of 2020-2022, the capacity of this park would reach 31.Asian Metal Copyright In the short-term period of 2020-2022, the capacity of this park would reach 31.Asian Metal CopyrightRecently, the Bureau of Industry and Information Technology of Rizhao secondly issued the environmental impact assessment for the plan of building production and smelting park of an advanced iron and steel manufacturing base in Rizhao and wanted to seek public opinions.Asian Metal Copyright10 million tons.Asian Metal CopyrightRecently, the Bureau of Industry and Information Technology of Rizhao secondly issued the environmental impact assessment for the plan of building production and smelting park of an advanced iron and steel manufacturing base in Rizhao and wanted to seek public opinions.Asian Metal Copyright The capacity would move up to 40 million tons in the long-term period from 2023-2025.
    .Asian Metal CopyrightRecently, the Bureau of Industry and Information Technology of Rizhao secondly issued the environmental impact assessment for the plan of building production and smelting park of an advanced iron and steel manufacturing base in Rizhao and wanted to seek public opinionsAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.