Western Power's copper-based new material project starts construction
2020-12-30 15:49:19 [Print]
On December 29, the project with an annual output of 200,000 tons of copper-based new materials and an annual output of 150,000 tons of high-precision die-casting parts invested by China Western Power Industrial Co
The project is located in Longgang Industrial Park, Yingtan High-tech Zone, Jiangxi, covering an area of 52.88 acres and a construction area of about 480,000 square meters . The project mainly manufactures metal products, metal materials and other products, which are widely used in electronics, electricity and other fields.
. , Ltd . started construction.The project is located in Longgang Industrial Park, Yingtan High-tech Zone, Jiangxi, covering an area of 52.88 acres and a construction area of about 480,000 square meters . The project mainly manufactures metal products, metal materials and other products, which are widely used in electronics, electricity and other fields.