• Spodumene Li2O 6%min CIF Chinaup(25)  08-12|Lithium Carbonate 99.2%min Delivered Chinaup(2200)  08-12|Spodumene Li2O 3%min In port Chinaup(25)  08-12|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinaup(2000)  08-12|Lithium Carbonate 99.5%min Delivered Chinaup(2200)  08-12|Ferro-phosphorus 23%min FOB Chinadown(-10)  08-12|Ferro-silicon 75%min In warehouse Pittsburghup(0.03)  08-12|Lithium Manganate Mn 58% Delivered Chinaup(800)  08-12|Spodumene Li2O 5%min In port Chinaup(30)  08-12|Cobalt Oxide 72%min Delivered Chinaup(5)  08-12|Yttrium Oxide 99.999%min In warehouse Rotterdamup(1.5)  08-12|Yttrium Oxide 99.999%min FOB Chinaup(0.3)  08-12|Ferro-tungsten 75%min FOB Chinaup(1.5)  08-12|Rebar BS4449 GR500 16mm In warehouse Kuala Lumpurup(50)  08-12
  • 157 coal mines resume production in Ordos by Mar 1st

    2020-03-03 16:18:17   [Print]
    According to news from Ordos Energy Administration on March 2nd, 2020, the city accumulatively restarted 157 coal mines by March 1st and the coal mines in production had a total production capacity of 549 million tons.Asian Metal Copyright On March 1st, one coal mine resumed production, with a total production capacity of 1 million tons.Asian Metal Copyright On March 1st, one coal mine resumed production, with a total production capacity of 1 million tons.
    .Asian Metal Copyright On March 1st, one coal mine resumed production, with a total production capacity of 1 million tonsAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.