• Spodumene Li2O 6%min CIF Chinaup(25)  08-12|Lithium Carbonate 99.2%min Delivered Chinaup(2200)  08-12|Spodumene Li2O 3%min In port Chinaup(25)  08-12|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinaup(2000)  08-12|Lithium Carbonate 99.5%min Delivered Chinaup(2200)  08-12|Ferro-phosphorus 23%min FOB Chinadown(-10)  08-12|Ferro-silicon 75%min In warehouse Pittsburghup(0.03)  08-12|Lithium Manganate Mn 58% Delivered Chinaup(800)  08-12|Spodumene Li2O 5%min In port Chinaup(30)  08-12|Cobalt Oxide 72%min Delivered Chinaup(5)  08-12|Yttrium Oxide 99.999%min In warehouse Rotterdamup(1.5)  08-12|Yttrium Oxide 99.999%min FOB Chinaup(0.3)  08-12|Ferro-tungsten 75%min FOB Chinaup(1.5)  08-12|Rebar BS4449 GR500 16mm In warehouse Kuala Lumpurup(50)  08-12
  • 134 coal mines in operation in Ordos by Feb 24

    2020-02-26 14:58:52   [Print]
    According to news from Ordos Energy Administration on February 25, as of February 24, 134 coal mines were in operation in Ordos with the total production capacity of 501 million tons.Asian Metal CopyrightAccording to news from Ordos Energy Administration on February 25, as of February 24, 134 coal mines were in operation in Ordos with the total production capacity of 501 million tons.Asian Metal Copyright Three of these coal mines resumed production on February 25, with the production capacity of 4 million tons.
    .Asian Metal CopyrightAccording to news from Ordos Energy Administration on February 25, as of February 24, 134 coal mines were in operation in Ordos with the total production capacity of 501 million tonsAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.