• Spodumene Li2O 6%min CIF Chinaup(25)  08-12|Lithium Carbonate 99.2%min Delivered Chinaup(2200)  08-12|Spodumene Li2O 3%min In port Chinaup(25)  08-12|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinaup(2000)  08-12|Lithium Carbonate 99.5%min Delivered Chinaup(2200)  08-12|Ferro-phosphorus 23%min FOB Chinadown(-10)  08-12|Ferro-silicon 75%min In warehouse Pittsburghup(0.03)  08-12|Lithium Manganate Mn 58% Delivered Chinaup(800)  08-12|Spodumene Li2O 5%min In port Chinaup(30)  08-12|Cobalt Oxide 72%min Delivered Chinaup(5)  08-12|Yttrium Oxide 99.999%min In warehouse Rotterdamup(1.5)  08-12|Yttrium Oxide 99.999%min FOB Chinaup(0.3)  08-12|Ferro-tungsten 75%min FOB Chinaup(1.5)  08-12|Rebar BS4449 GR500 16mm In warehouse Kuala Lumpurup(50)  08-12
  • 113 coal mines in operation in Ordos by Feb 20

    2020-02-24 15:15:22   [Print]
    According to news from Ordos Bureau of Industry and Information Technology, as of February 20, 113 coal mines were in operation in Ordos with the total production capacity of 476 million tons, including 28 coal mines which were still in operation during the Spring Festival with a capacity of 249 million tons and 85 coal mines which resumed production after the festival with a capacity of 227 million tons and a recovery rate of 68%.
      Copyright © Asian Metal Ltd All rights reserved.