• Lanthanum Metal 99%min EXW Chinadown(-600)  09-23|Ilmenite Conc 50%min In port Chinadown(-50)  09-23|Ilmenite Conc 50%min EXW Chinadown(-50)  09-23|Graphite Electrode H.P. D300mm FOB Chinaup(50)  09-23|Yttrium Oxide 99.999%min In warehouse Rotterdamup(2)  09-23|Graphite Electrode H.P. D450mm FOB Chinaup(50)  09-23|Graphite Electrode R.P. D400mm EXW Chinaup(300)  09-23|Antimony Trioxide 99.5%min In warehouse Rotterdamdown(-1)  09-23|Cobalt Metal 99.8%min Delivered Chinaup(6)  09-23|Coking Coal A 10%max, S 0.8%max EXW Hebeiup(30)  09-23|Coking Coal A 10%max, S 0.8%max EXW Henanup(30)  09-23|Graphite Electrode H.P. D400mm EXW Chinaup(300)  09-23|Graphite Electrode H.P. D500mm EXW Chinaup(300)  09-23|Graphite Electrode U.H.P. D500mm FOB Chinaup(50)  09-23
  • Capacity transfer scheme of Rizhao Steel

    2019-12-13 15:37:10   [Print]
    On December 12, Department of Industry and Information Technology of Shandong sought public opinions on the capacity transfer scheme of Rizhao Steel Holding Group Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright25 of iron-making; 180 of steel-making Before the construction project start Before the construction project start 3 The rest of 689,000t of iron-making capacity and 659,000t of steel-making capacity of capacity transfer scheme for Rizhao Steel Holding Group Co.Asian Metal Copyright; the publication period is from December 12, 2019 to January 9, 2020.

    Construction of Project

    Company

    Location

    Facility

    Capacity (10kt)

    Proposed building time

    Proposed start time

    Transfer ratio

    Rizhao Steel Holding Group Co., Ltd.

    Lanshan District, Rizhao

    1 blast furnace of 300 cubic meters; 2 converters of 120t

    250 of iron-making; 270of steel-making

    2020

    2022

    Reduction

    Cancelled Project

    No.

    Location

    Company

    Facility

    Capacity (10kt)

    Demolition start date

    Demolition completion date

    Note

    1

    Shandong

    Zibo Qilin Fushan Iron and Steel Co., Ltd.

    1 blast furnace of 630 cubic meters; 1 converter of 40t

    73 of iron-making; 60 of steel-making

    Before the construction project start

    Before the construction project start

    This reduction transfer consists of 1,000t of iron-making and 1,000t of steel-making. The rest of 430,500t of iron-making and 358,000t of steel-making will be used in future capacity transfer.

    2

    Shandong

    Shandong Longsheng Iron and Steel Co., Ltd.

    1 blast furnace of 630 cubic meters; 1 blast furnace of 720 cubic meters; 2 converters of 65t

    151.25 of iron-making; 180 of steel-making

    Before the construction project start

    Before the construction project start

    3

    The rest of 689,000t of iron-making capacity and 659,000t of steel-making capacity of capacity transfer scheme for Rizhao Steel Holding Group Co., Ltd. that published on November 13, 2019



    .Asian Metal Copyright Lanshan District, Rizhao 1 blast furnace of 300 cubic meters; 2 converters of 120t 250 of iron-making; 270of steel-making 2020 2022 Reduction Cancelled Project NoAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.