• Copper Cathode 99.99%min Delivered Chinaup(2400)  09-25|Cobalt Chloride 24%min Delivered Chinaup(2000)  09-25|Ammonium Metavanadate 98%min EXW Chinadown(-2000)  09-25|Selenium Powder 99.9%min Delivered Chinadown(-5)  09-25|Ferro-silicon 75%min In warehouse Pittsburghdown(-0.03)  09-25|Copper Conc. 20%min Delivered Chinaup(2000)  09-25|Cobalt Sulfate 20.5%min Delivered Chinaup(1500)  09-25|Copper Scrap Wire 99%min Delivered Chinaup(2000)  09-25|Cobalt Oxide 72%min Delivered Chinaup(5)  09-25|Cobalt Tetroxide 73.5%min Delivered Chinaup(5)  09-25|Ferro-silicon 70%min EXW Indiadown(-2000)  09-25|Selenium Powder 99.95%min Delivered Chinadown(-5)  09-25|NdFeB Sintered Rough N35 EXW Chinadown(-3)  09-25|Cobalt Powder 99.5%min Delivered Chinaup(6)  09-25
  • HBMG reduces some coal capacity

    2019-07-30 17:17:54   [Print]
    Huaibei Mining (HBMG) disclosed on the evening of July 29 that the company recently received the approval of production capacity reduction in Zhuzhuang and other coal mines of Huaibei Mining Group from Anhui Energy Bureau.

    Anhui Energy Bureau agreed in principle that the production capacity of Zhuzhuang Coal Mine, a wholly-owned subsidiary of Huaibei Mining Co., Ltd.Asian Metal Copyright8 million tons per year to 1.Asian Metal Copyright, should be reduced from 1.Asian Metal Copyright8 million tons per year to 1.Asian Metal Copyright9 million tons per year to 1.Asian Metal Copyright At present, it is carrying out the work of CBM exploration, geological report review and filing and other works.Asian Metal Copyright6 million tons per year, with a reduction of 300,000 tons per year; Tongting Coal Mine should reduce the capacity from 1.Asian Metal Copyright, Ltd.Asian Metal Copyright8 million tons per year to 1.Asian Metal Copyright The production capacity of Qinan Coal Mine should be reduced from 3 million tons per year to 2.Asian Metal Copyright5 million tons per year, with a reduction of 300,000 tons per year; Linhuan Coal Mine should lower it from 3 million tons per year to 2.Asian Metal Copyright Anhui Energy Bureau agreed in principle that the production capacity of Zhuzhuang Coal Mine, a wholly-owned subsidiary of Huaibei Mining Co.Asian Metal Copyright6 million tons per year, with a reduction of 400,000 tons per year.Asian Metal Copyright The production capacity of Qinan Coal Mine should be reduced from 3 million tons per year to 2.Asian Metal Copyright The production capacity of Qinan Coal Mine should be reduced from 3 million tons per year to 2.Asian Metal Copyright, Ltd.Asian Metal Copyright6 million tons per year, down by 400,000 tons per year.

    After conversion, the reduced production capacity of the above-mentioned coal mines is intended to be used in Taohutu mine of Erdos Chengda Mining Co., Ltd.Asian Metal Copyright6 million tons per year, down by 400,000 tons per year.Asian Metal Copyright, a subsidiary of HBMG.Asian Metal Copyright, a subsidiary of HBMG.Asian Metal Copyright Chengda Mining obtained the minefield exploration license of mineral resources in Taohutu in April 2019.Asian Metal Copyright After conversion, the reduced production capacity of the above-mentioned coal mines is intended to be used in Taohutu mine of Erdos Chengda Mining Co.Asian Metal Copyright At present, it is carrying out the work of CBM exploration, geological report review and filing and other works.Asian Metal Copyright, Ltd.Asian Metal Copyright It intends to apply to the National Energy Administration of PRC for capacity replacement after the completion of the above works.

    .Asian Metal Copyright6 million tons per year, with a reduction of 400,000 tons per yearAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.