• Spodumene Li2O 6%min CIF Chinaup(25)  08-11|Lithium Carbonate 99.2%min Delivered Chinaup(2200)  08-11|Spodumene Li2O 3%min In port Chinaup(25)  08-11|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinaup(2000)  08-11|Lithium Carbonate 99.5%min Delivered Chinaup(2200)  08-11|Lithium Iron Phosphate Li 3.9%min Delivered Chinaup(1000)  08-11|Spodumene Li2O 5%min In port Chinaup(30)  08-11|Ferro-phosphorus 23%min FOB Chinadown(-10)  08-11|Rhenium APR 99.99%min EXW Chinaup(300)  08-11|Tungsten Ore WO3 50%min FOB Africaup(10)  08-11|Samarium Cobalt 30H EXW Chinaup(6)  08-11|Yttrium Oxide 99.999%min In warehouse Rotterdamup(1.5)  08-11|Yttrium Oxide 99.999%min FOB Chinaup(0.3)  08-11|Ferro-tungsten 75%min FOB Chinaup(1.5)  08-11
  • Western Mining: Reconstruction and expansion of Yulong Copper Mine to speed up

    2018-12-14 17:53:52   [Print]
    On December 12, the signing ceremony of syndicated loan for the reconstruction and expansion of Yulong Copper Mine ("the project") was held in Chengdu.Asian Metal Copyright027 billion.Asian Metal Copyright Yulong Copper Mine is owned by Tibet Yulong Copper Co.Asian Metal Copyright383 billion in 2021.Asian Metal Copyright, Ltd, a holding subsidiary of Western Mining.Asian Metal Copyright, Ltd, a holding subsidiary of Western Mining.Asian Metal Copyright The project obtained a syndicated loan of RMB8.Asian Metal Copyright867 billion in 2020 and RMB1.Asian Metal Copyright184 billion from six banks including China Development Bank Tibet Branch and China Construction Bank Tibet Branch, which marks the acceleration of the project.

    The total investment for the phase II project is RMB10.6 billion, and RMB2.Asian Metal Copyright In the first eleven months of 2018, the company produced 28,500t of copper and generated revenue of RMB1.Asian Metal Copyright4 billion has already been invested.Asian Metal Copyright6 billion, and RMB2.Asian Metal Copyright The total investment includes RMB450 million in 2018, RMB3.Asian Metal Copyright The total investment includes RMB450 million in 2018, RMB3.Asian Metal Copyright5 billion in 2019, RMB2.Asian Metal CopyrightOn December 12, the signing ceremony of syndicated loan for the reconstruction and expansion of Yulong Copper Mine "the project" was held in Chengdu.Asian Metal Copyright867 billion in 2020 and RMB1.Asian Metal Copyright The total investment for the phase II project is RMB10.Asian Metal Copyright383 billion in 2021.

    According to the company, Yulong Copper has been doing well since the completion of phase I project. In the first eleven months of 2018, the company produced 28,500t of copper and generated revenue of RMB1.Asian Metal Copyright027 billion.Asian Metal Copyright027 billion.

    Western Mining defines the reconstruction and expansion of Yulong Copper Mine as a key project. Upon reaching target production capacity after two to three years of construction, Western Mining predicts that its copper production would increase from 30,000t to 12,000t per year.

    .Asian Metal Copyright According to the company, Yulong Copper has been doing well since the completion of phase I projectAsian Metal Copyright
    Copper Conc. 20%min Delivered China
    Unit:RMB/mt Cu
    Copper Conc. 20%min Delivered China RMB/mt Cu
    China copper concentrate producers' sales volume statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.