• Manganese Ore Gabonese 44%min In Qinzhou Port(3.1)  05-15|Manganese Ore Brazilian 44%min In Qinzhou Port(3.1)  05-15|Manganese Ore Gabonese 44%min In Tianjin Port(3.1)  05-15|Manganese Ore Brazilian 44%min In Tianjin Port(3.1)  05-15|Manganese Ore Australian 45%min In Qinzhou Port(3)  05-15|Manganese Ore Australian 45%min In Tianjin Port(3)  05-15|Copper Conc. TC 25%min CIF China(-1)  05-15|Antimony Trioxide 99.8%min Delivered China(3000)  05-15|Tungsten APT 88.5%min FOB China(10)  05-15|Lithium Carbonate 99.2%min Delivered China(-3000)  05-15|Lithium Carbonate 99.5%min Delivered China(-3000)  05-15|Tungsten Oxide WO3 99.95%min FOB China(10)  05-15|Tin Conc. Burmese 20%min In warehouse MengA(6000)  05-15|Lithium Manganate Mn 58% Delivered China(-1000)  05-15
  • China Second Metallurgy wins bidding for Phase I Fengzhen project of 1 million tons for ferroalloy

    2017-09-05 11:56:06   [Print]
    On August 25, China Second Metallurgy Group Corporation Limited won the bidding for the steel structure engineering and installation of No.Asian Metal Copyright5 workshop plant of the Phase I Fengzhen project of 1 million tons for ferroalloy from Jilin Ferroalloy Co.Asian Metal Copyright4 workshop and No.Asian Metal Copyright, Ltd.Asian Metal Copyright5 workshop plant of the Phase I Fengzhen project of 1 million tons for ferroalloy from Jilin Ferroalloy Co.Asian Metal Copyright The construction area covers about 20,000 square meters with about 6,900t of steel structure and the construction mainly includes civil engineering of plants, steel structure manufacture, the installation and related work.Asian Metal Copyright, Ltd.Asian Metal Copyright The project is designed as a production base with total annual capacity of 3 million tons for manganese, chromium, silicon, nitrogen alloy and composite alloy and various ferroalloys.Asian Metal Copyright and the bidding is opened by Angang Group.

    The project is designed as a production base with total annual capacity of 3 million tons for manganese, chromium, silicon, nitrogen alloy and composite alloy and various ferroalloys. The construction area covers about 20,000 square meters with about 6,900t of steel structure and the construction mainly includes civil engineering of plants, steel structure manufacture, the installation and related work.
    .Asian Metal Copyright, LtdAsian Metal Copyright
    Ferro-chrome Indian Cr 58%min, C 8%max In port China
    Unit:RMB/mt 50-basis
    China low carbon ferrochrome producers' output statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.