• Manganese Ore S.A. 36%min In Qinzhou Port(2.5)  04-28|Manganese Ore S.A. 36%min In Tianjin Port(2.5)  04-28|Manganese Ore S.A. 37%min In Qinzhou Port(2.5)  04-28|Manganese Ore S.A. 37%min In Tianjin Port(2.5)  04-28|Manganese Ore Gabonese 44%min In Tianjin Port(2.5)  04-28|Manganese Ore Australian 45%min In Qinzhou Port(2.5)  04-28|Manganese Ore Gabonese 44%min In Qinzhou Port(2.5)  04-28|Manganese Ore Australian 45%min In Tianjin Port(2.5)  04-28|Manganese Ore Brazilian 44%min In Tianjin Port(2.5)  04-28|Manganese Ore Brazilian 44%min In Qinzhou Port(1.5)  04-28|Manganese Ore Carbonate, Mn 13%min EXW China(1)  04-28|Selenium Powder 99.9%min Delivered India(50)  04-28|Met. Coke A 13%max, S 0.7%max EXW Shanxi(50)  04-28|Copper Conc. TC 25%min CIF China(-1)  04-28
  • 30ktpa anode materials project put into operation in Yunxian, China

    2023-11-14 11:50:33   [Print]
    On November 9, Yunnan Kaiyaowei New Energy Technology Co.Asian Metal Copyright87 million.Asian Metal Copyright, Ltd.Asian Metal Copyright The project would achieve annual production capacity of RMB3 billion USD411 million along with tax revenue of RMB390 million USD53.Asian Metal Copyright began the phase one production at its 180,000tpa lithium battery materials project located in Yunxian.

    With investment of RMB620 million (USD85.02 million) and a land area of 100Mu (6.Asian Metal Copyright12 billion USD428 million, the project is expected to put capacity of 60,000tpa into operation by 2024 and reach full capacity by November 2025.Asian Metal Copyright67 hectares), the phase one of the project broke ground in May 2022 to build production capacity of 30,000tpa of anode materials used for lithium battery and is expected to generate annual production value of RMB600 million (USD82.Asian Metal Copyright The project would achieve annual production capacity of RMB3 billion USD411 million along with tax revenue of RMB390 million USD53.Asian Metal Copyright28 million) and tax revenue of RMB72 million (USD9.Asian Metal Copyright began the phase one production at its 180,000tpa lithium battery materials project located in Yunxian.Asian Metal Copyright87 million).

    At the newly-built No.1 plant, seven production lines are put into operation, including six grinding lines and one drying line.Asian Metal CopyrightOn November 9, Yunnan Kaiyaowei New Energy Technology Co.Asian Metal Copyright So far, the company has signed orders of 1,800t of raw material, with 300t already delivered to warehouse.

    With a total investment of RMB3.12 billion (USD428 million), the project is expected to put capacity of 60,000tpa into operation by 2024 and reach full capacity by November 2025.Asian Metal Copyright .Asian Metal Copyright The project would achieve annual production capacity of RMB3 billion (USD411 million) along with tax revenue of RMB390 million (USD53.Asian Metal Copyright With a total investment of RMB3.Asian Metal Copyright48 million), and help create more than 800 jobs.

    .Asian Metal Copyright12 billion USD428 million, the project is expected to put capacity of 60,000tpa into operation by 2024 and reach full capacity by November 2025Asian Metal Copyright
    Lithium Hydroxide Monohydrate LiOH 56.5%min Delivered China
    Unit:RMB/mt
    China lithium carbonate 99%min producers' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.