• Manganese Ore S.A. 36%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 36%min In Tianjin Port(2)  04-26|Manganese Ore S.A. 37%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 37%min In Tianjin Port(2)  04-26|Manganese Ore Brazilian 44%min In Qinzhou Port(2.1)  04-26|Manganese Ore Brazilian 44%min In Tianjin Port(2.1)  04-26|Manganese Ore Gabonese 44%min In Tianjin Port(1.9)  04-26|Manganese Ore Gabonese 44%min In Qinzhou Port(1.9)  04-26|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  04-26|Manganese Ore Australian 45%min In Tianjin Port(1.8)  04-26|Silicon Metal 98.5%min Delivered US(0.04)  04-26|Copper Conc. TC 25%min CIF China(-1)  04-26|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-26|Zinc Conc. TC 50% CIF China(-1.5)  04-26
  • Jinyaoshi lithium battery materials project to break ground in Yunmeng

    2023-08-04 11:56:53   [Print]
    On July 25, Hubei Jiasheng Technology Co.Asian Metal Copyright97 million of tax contribution.Asian Metal Copyright, Ltd.Asian Metal Copyright38 million, would produce 100t of lithium hydride and 200t of lithium oxide annually, amounting to production value of RMB600 million USD83.Asian Metal Copyright entered into an agreement to build Jinyaoshi lithium battery materials project with total investment of RMB445 million (USD62.Asian Metal Copyright05 million in Yunmeng, a county in China's Hubei province.Asian Metal Copyright05 million) in Yunmeng, a county in China's Hubei province.

    The project will be located at Yunmeng Salt Chemical Industry Park with a planned area of 50Mu (3.33 hectares).Asian Metal Copyright entered into an agreement to build Jinyaoshi lithium battery materials project with total investment of RMB445 million USD62.Asian Metal Copyright Phase one of the project, with investment of RMB225 million (USD31.Asian Metal Copyright05 million in Yunmeng, a county in China's Hubei province.Asian Metal Copyright38 million), would produce 100t of lithium hydride and 200t of lithium oxide annually, amounting to production value of RMB600 million (USD83.Asian Metal Copyright When reaching full capacity, the project is expected to achieve annual sales revenue of more than RMB490 million USD68.Asian Metal Copyright67 million).Asian Metal Copyright The project will be located at Yunmeng Salt Chemical Industry Park with a planned area of 50Mu 3.Asian Metal Copyright The second phase, with investment of RMB220 million (USD30.Asian Metal Copyright Phase one of the project, with investment of RMB225 million USD31.Asian Metal Copyright68 million), would produce 200t of lithium hydride and 1,000t of lithium oxide per annum.Asian Metal Copyright The project will be located at Yunmeng Salt Chemical Industry Park with a planned area of 50Mu 3.Asian Metal Copyright When reaching full capacity, the project is expected to achieve annual sales revenue of more than RMB490 million (USD68.Asian Metal Copyright entered into an agreement to build Jinyaoshi lithium battery materials project with total investment of RMB445 million USD62.Asian Metal Copyright33 million) and at least RMB50 million (USD6.Asian Metal Copyright68 million, would produce 200t of lithium hydride and 1,000t of lithium oxide per annum.Asian Metal Copyright97 million) of tax contribution.

    .Asian Metal CopyrightOn July 25, Hubei Jiasheng Technology CoAsian Metal Copyright
    Lithium Hydroxide Monohydrate LiOH 56.5%min, Magnets 0.0001%max Delivered China
    Unit:RMB/mt
    China lithium hydroxide monohydrate producers; sales to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.