Yongshan Lithium breaks ground on phase two of 45ktpy lithium salt project
2023-04-13 12:01:45
[Print]
On April 11, the second phase of the 45,000tpy lithium salt project developed by Yongshan Lithium broke ground at Tongguan Industrial Park in Changsha Wangcheng Economic Development Zone.Asian Metal Copyright The first phase of the project became operational in June 2022 and reached full capacity of 25,000tpy ahead of schedule in October of the same year.Asian Metal Copyright The project was invested by Shanshan Holdings Ltd.Asian Metal Copyright The project was invested by Shanshan Holdings Ltd.Asian Metal Copyright and it is the first lithium salt project developed in Hunan.Asian Metal Copyright
.Asian Metal Copyright The first phase of the project became operational in June 2022 and reached full capacity of 25,000tpy ahead of schedule in October of the same year.
.Asian Metal Copyright The first phase of the project became operational in June 2022 and reached full capacity of 25,000tpy ahead of schedule in October of the same yearAsian Metal Copyright
Lithium Hydroxide Monohydrate LiOH 56.5%min Delivered China
Unit:RMB/mt
China lithium hydroxide monohydrate producers; sales volume statistics by province by month
Unit: mt