• Ferro-manganese Mn 65%min, C 7%max EXW China(200)  04-30|Ferro-manganese Mn 75%min, C 8%max EXW China(200)  04-30|Silico-manganese 65/17 EXW China(200)  04-30|Copper Conc. TC 25%min CIF China(-1)  04-30|Zinc Conc. 50%min EXW North China(480)  04-30|Ferro-silicon 75%min EXW China(200)  04-30|Zinc Conc. 50%min EXW South China(480)  04-30|Selenium Powder 99.9%min Delivered India(50)  04-30|Ferro-chrome Cr 60%min, C 8%max In warehouse Pittsburg(-0.05)  04-30|Zinc Ingot 99.99%min EXW China (600)  04-30|Zinc Ingot 99.995%min In warehouse Tianjin(600)  04-30|Zinc Ingot 99.995%min In warehouse Shanghai(600)  04-30|Zinc Ingot 99.995%min In warehouse Guangzhou(600)  04-30|Ferro-manganese Mn 75%min, C 2%max EXW China(200)  04-30
  • Kaijin New Energy Technology: phase two of 200,000tpy anode material project starts construction

    2023-01-04 15:21:47   [Print]
    On January 1, 2022, phase two of the 200,000tpy anode material project invested by Jiangsu Kaijin New Energy Technology Co.Asian Metal Copyright Phase two has an investment of RMB3 billion USD0.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright started construction.Asian Metal Copyright44 billion and focusing upon construction of grinding, surface modification, low-temperature carbonization and central storage facilities, commenced construction on February 28, 2022.Asian Metal Copyright With a total investment of RMB6 billion (USD0.Asian Metal Copyright, Ltd.Asian Metal Copyright87 billion), the two-phase project will be a 200,000t of Li-battery anode material integrated production base supported by related R&D, test centers.Asian Metal Copyright .Asian Metal Copyright Phase one, with an investment of RMB3 billion (USD0.Asian Metal Copyright Phase one, with an investment of RMB3 billion USD0.Asian Metal Copyright44 billion) and focusing upon construction of grinding, surface modification, low-temperature carbonization and central storage facilities, commenced construction on February 28, 2022.Asian Metal Copyright Phase two has an investment of RMB3 billion USD0.Asian Metal Copyright Phase two has an investment of RMB3 billion (USD0.Asian Metal Copyright started construction.Asian Metal Copyright44 billion) and will focus on high-temperature carbonization and ultra-high-temperature graphitization.

    .Asian Metal Copyright44 billion and will focus on high-temperature carbonization and ultra-high-temperature graphitizationAsian Metal Copyright
    Lithium Iron Phosphate Li 3.9%min Delivered China
    Unit:RMB/mt
    China lithium cobaltate producers' output statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.