• Manganese Ore Gabonese 44%min In Qinzhou Port(3.1)  05-15|Manganese Ore Brazilian 44%min In Qinzhou Port(3.1)  05-15|Manganese Ore Gabonese 44%min In Tianjin Port(3.1)  05-15|Manganese Ore Brazilian 44%min In Tianjin Port(3.1)  05-15|Manganese Ore Australian 45%min In Qinzhou Port(3)  05-15|Manganese Ore Australian 45%min In Tianjin Port(3)  05-15|Copper Conc. TC 25%min CIF China(-1)  05-15|Antimony Trioxide 99.8%min Delivered China(3000)  05-15|Tungsten APT 88.5%min FOB China(10)  05-15|Lithium Carbonate 99.2%min Delivered China(-3000)  05-15|Lithium Carbonate 99.5%min Delivered China(-3000)  05-15|Tungsten Oxide WO3 99.95%min FOB China(10)  05-15|Tin Conc. Burmese 20%min In warehouse MengA(6000)  05-15|Lithium Manganate Mn 58% Delivered China(-1000)  05-15
  • Quzhou Huachuang New Material breaks ground on 100ktpy copper foil project

    2022-12-29 15:06:25   [Print]
    Zhejiang Quzhou Huachuang New Material Copper Foil Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright held the groundbreaking ceremony for its 100,000tpy high-performance copper foil project on December 27.Asian Metal Copyright held the groundbreaking ceremony for its 100,000tpy high-performance copper foil project on December 27.

    With a total investment of nearly RMB10 billion (USD143 million) and covering an area of 60 Mu (44 hectares), the project consists of two phases and the first phase with capacity of 25,000tpy is expected to commence production in June 2024, followed by phase two with capacity of 75,000tpy, which is scheduled to complete construction before December 2026. The project is expected to generate annual operating revenue of about RMB10 billion (USD143 million) when reaching full production.
    .Asian Metal Copyright, LtdAsian Metal Copyright
    Lithium Iron Phosphate Li 3.9%min Delivered China
    Unit:RMB/mt
    China lithium carbonate 99.5%mi producers' sales volume statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.