Narada Power Source expects to build 5GWh lithium battery capacity in 2022
2022-12-27 16:53:02
[Print]
On December 26, Narada Power Source announced on the interactive platform that it expected to build 5GWh lithium battery capacity this year.Asian Metal Copyright In addition, the construction progress of 3GWh capacity base is delayed due to the epidemic situation.Asian Metal Copyright Up to now, 2Gwh has been in production and commissioning.Asian Metal Copyright Up to now, 2Gwh has been in production and commissioning.Asian Metal Copyright In addition, the construction progress of 3GWh capacity base is delayed due to the epidemic situation.Asian Metal CopyrightOn December 26, Narada Power Source announced on the interactive platform that it expected to build 5GWh lithium battery capacity this year.Asian Metal Copyright It is expected that 10GWh lithium battery capacity can be achieved by the first half of next year.
.Asian Metal Copyright In addition, the construction progress of 3GWh capacity base is delayed due to the epidemic situationAsian Metal Copyright
Lithium Iron Phosphate Li 3.9%min Delivered China
Unit:RMB/mt
China lithium carbonate 99.5%mi producers' sales volume statistics by province by month
Unit: mt