LB Group puts 50,000tpy production lines of battery material grade ferric phosphate project (phase two) into operation
2022-11-17 16:46:32
[Print]
LB Group announced on November 16th that its 50,000tpy production lines of a 200,000tpy battery material grade ferric phosphate project (phase two) were completed and put into operation, which indicated that the company's ferric phosphate production capacity reached 100,000tpy, ranking among the top five within the industry.Asian Metal CopyrightLB Group announced on November 16th that its 50,000tpy production lines of a 200,000tpy battery material grade ferric phosphate project phase two were completed and put into operation, which indicated that the company's ferric phosphate production capacity reached 100,000tpy, ranking among the top five within the industry.Asian Metal Copyright In addition, the company already launched the construction of the phase three project of 100,000tpy, which is expected to be completed and put into operation in the third quarter of 2023.
.Asian Metal Copyright In addition, the company already launched the construction of the phase three project of 100,000tpy, which is expected to be completed and put into operation in thethird quarter of 2023Asian Metal Copyright
Lithium Iron Phosphate Li 3.9%min Delivered China
Unit:RMB/mt
China lithium hydroxide monohydrate producers; suspension number statistics by province by month
Unit: pcs