• Manganese Ore S.A. 36%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 36%min In Tianjin Port(2)  04-26|Manganese Ore S.A. 37%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 37%min In Tianjin Port(2)  04-26|Manganese Ore Brazilian 44%min In Qinzhou Port(2.1)  04-26|Manganese Ore Brazilian 44%min In Tianjin Port(2.1)  04-26|Manganese Ore Gabonese 44%min In Qinzhou Port(1.9)  04-26|Manganese Ore Gabonese 44%min In Tianjin Port(1.9)  04-26|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  04-26|Manganese Ore Australian 45%min In Tianjin Port(1.8)  04-26|Silicon Metal 98.5%min Delivered US(0.04)  04-26|Copper Conc. TC 25%min CIF China(-1)  04-26|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-26|Zinc Conc. TC 50% CIF China(-1.5)  04-26
  • ZTT wins large energy-storage projects of RMB1.358 billion

    2022-07-04 13:34:42   [Print]
    Zhongtian Techology (ZTT) announced on July 3rd that it and its wholly-owned subsidiary, Zhongtian Energy Storage Technology Co.Asian Metal Copyright successively received the bids notice from bidding agent, indicating that it and its subsidiary won the bids for CGN's 2022 LFP battery energy-storage system framework purchase project section two and the design, supply, engineering, debugging and two-year operation and maintenance for Mongolia's 80MW200MWh large energy-storage project with a toal amount of about RMB1.Asian Metal Copyright, Ltd. successively received the bids notice from bidding agent, indicating that it and its subsidiary won the bids for CGN's 2022 LFP battery energy-storage system framework purchase project (section two) and the design, supply, engineering, debugging and two-year operation and maintenance for Mongolia's 80MW/200MWh large energy-storage project with a toal amount of about RMB1.Asian Metal Copyright successively received the bids notice from bidding agent, indicating that it and its subsidiary won the bids for CGN's 2022 LFP battery energy-storage system framework purchase project section two and the design, supply, engineering, debugging and two-year operation and maintenance for Mongolia's 80MW200MWh large energy-storage project with a toal amount of about RMB1.Asian Metal Copyright358 billion (USD202.Asian Metal Copyright, Ltd.Asian Metal Copyright75 million).

    .Asian Metal Copyright75 millionAsian Metal Copyright
    Lithium Iron Phosphate Li 3.9%min Delivered China
    Unit:RMB/mt
    China lithium nickel cobalt manganese oxide producers' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.