• Manganese Ore S.A. 36%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 36%min In Tianjin Port(2)  04-26|Manganese Ore S.A. 37%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 37%min In Tianjin Port(2)  04-26|Manganese Ore Brazilian 44%min In Qinzhou Port(2.1)  04-26|Manganese Ore Brazilian 44%min In Tianjin Port(2.1)  04-26|Manganese Ore Gabonese 44%min In Qinzhou Port(1.9)  04-26|Manganese Ore Gabonese 44%min In Tianjin Port(1.9)  04-26|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  04-26|Manganese Ore Australian 45%min In Tianjin Port(1.8)  04-26|Silicon Metal 98.5%min Delivered US(0.04)  04-26|Copper Conc. TC 25%min CIF China(-1)  04-26|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-26|Zinc Conc. TC 50% CIF China(-1.5)  04-26
  • PhaseⅠproject of CGN Hinggan League 3 million kilowatts wind power base put into operation

    2022-06-30 15:27:40   [Print]
    On June 29, the phaseⅠproject of CGN Group's Hinggan League 3 million kilowatts wind power base in Inner Mongolia was connected to the grid and began to generate electricity, marking that China's first single million kilowatts-scale onshore wind power base was officially put into operation.
    PrNd Mischmetal Pr 25%, Nd 75% EXW China
    Unit:RMB/mt
    China's rare earth seperation plants' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.