Tianyuan Group: 100,000tpy LFP cathode material integrated project obtains investment record form
2022-05-12 16:00:15
[Print]
Tianyuan Group disclosed on May 11 that 100,000tpy LFP (lithium iron phosphate) cathode material integrated project is planned to start construction in the third quarter of 2022, and the construction period is expected to be 18 months.Asian Metal Copyright At present, all the above-mentioned integration projects have obtained the "Fixed Assets Investment Record Form of Sichuan Province", and the preliminary preparations are in smooth progress, striving to start construction as soon as possible.Asian Metal Copyright At present, all the above-mentioned integration projects have obtained the "Fixed Assets Investment Record Form of Sichuan Province", and the preliminary preparations are in smooth progress, striving to start construction as soon as possible.
.Asian Metal CopyrightTianyuan Group disclosed on May 11 that 100,000tpy LFP lithium iron phosphate cathode material integrated project is planned to start construction in the third quarter of 2022, and the construction period is expected to be 18 monthsAsian Metal Copyright
Lithium Iron Phosphate Li 3.9%min Delivered China
Unit:RMB/mt
China lithium cobaltate producers' output statistics by province by month
Unit: mt