• Manganese Ore S.A. 36%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 36%min In Tianjin Port(2)  04-26|Manganese Ore S.A. 37%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 37%min In Tianjin Port(2)  04-26|Manganese Ore Brazilian 44%min In Qinzhou Port(2.1)  04-26|Manganese Ore Brazilian 44%min In Tianjin Port(2.1)  04-26|Manganese Ore Gabonese 44%min In Qinzhou Port(1.9)  04-26|Manganese Ore Gabonese 44%min In Tianjin Port(1.9)  04-26|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  04-26|Manganese Ore Australian 45%min In Tianjin Port(1.8)  04-26|Silicon Metal 98.5%min Delivered US(0.04)  04-26|Copper Conc. TC 25%min CIF China(-1)  04-26|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-26|Zinc Conc. TC 50% CIF China(-1.5)  04-26
  • Volkswagen ahead of schedule in electric cars production

    2019-12-30 13:33:07   [Print]
    Volkswagen said last Friday that it would reach a key target in the production of electric autos earlier than previously anticipated.

    The German automaker will have produced one million electric vehicles by the end of 2023, two years ahead of schedule.

    It now expects to have produced 1.5 million electric autos by 2025, it said.

    .Asian Metal Copyright5 million electric autos by 2025, it saidAsian Metal Copyright
    LNCMO 523 Delivered China
    Unit:RMB/kg
    China lithium nickel cobalt manganese oxide producers' suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.