• Manganese Ore S.A. 36%min In Tianjin Port(3)  05-11|Manganese Ore S.A. 37%min In Tianjin Port(3)  05-11|Manganese Ore Gabonese 44%min In Tianjin Port(3)  05-11|Manganese Ore Carbonate, Mn 13%min EXW China(2)  05-11|Manganese Ore S.A. 36%min In Qinzhou Port(2.5)  05-11|Manganese Ore S.A. 37%min In Qinzhou Port(2.5)  05-11|Manganese Ore Gabonese 44%min In Qinzhou Port(2.5)  05-11|Manganese Ore Brazilian 44%min In Qinzhou Port(2.5)  05-11|Manganese Ore Australian 45%min In Qinzhou Port(2.5)  05-11|Manganese Ore Australian 45%min In Tianjin Port(2.5)  05-11|Manganese Ore Brazilian 44%min In Tianjin Port(2.5)  05-11|Copper Conc. TC 25%min CIF China(-1)  05-11|Dysprosium Oxide 99.5%min EXW China(60)  05-11|Lithium Hydroxide Monohydrate LiOH 56.5%min, Magnets 0.0001%max Delivered China(-3000)  05-11
  • CITIC Dameng initiates formal operation of Phase Two LMO project

    2019-06-05 17:52:36   [Print]
    On May 30, No.Asian Metal Copyright .Asian Metal Copyright 1 production lines of CITIC Dameng's 10,000tpa Phase Two LMO project went into formal operation.

    The Phase Two LMO project adopts fully automated production lines as well as technologies and indicators leading in the Chinese LMO industry. The project can produce products including 13H and 13D series as well as 15 series which are under technical research and development now, and therefore can provide downstream new energy battery producers with high-quality products catering to their different needs.

    .Asian Metal Copyright 1 production lines of CITIC Dameng's 10,000tpa Phase Two LMO project went into formal operationAsian Metal Copyright
    Lithium Manganate Mn 58% Delivered China
    Unit:RMB/mt
    China lithium carbonate 99.5%mi producers' sales volume statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.