• Manganese Ore S.A. 36%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 36%min In Tianjin Port(2)  04-26|Manganese Ore S.A. 37%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 37%min In Tianjin Port(2)  04-26|Manganese Ore Brazilian 44%min In Qinzhou Port(2.1)  04-26|Manganese Ore Brazilian 44%min In Tianjin Port(2.1)  04-26|Manganese Ore Gabonese 44%min In Qinzhou Port(1.9)  04-26|Manganese Ore Gabonese 44%min In Tianjin Port(1.9)  04-26|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  04-26|Manganese Ore Australian 45%min In Tianjin Port(1.8)  04-26|Silicon Metal 98.5%min Delivered US(0.04)  04-26|Copper Conc. TC 25%min CIF China(-1)  04-26|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-26|Zinc Conc. TC 50% CIF China(-1.5)  04-26
  • Baoneng commences construction of new energy vehicle industrial parks

    2017-12-27 16:59:15   [Print]
    On December 26, Baoneng Group commenced construction of new energy vehicle industrial parks in Huangpu District and Guangzhou Development District with a total investment of RMB30 billion.Asian Metal Copyright The first planning capacity will reach 500,000 new energy vehicles and related supporting projects, and the output value of vehicle and parts manufacturing will exceed RMB100 billion when it reaches design capacity.Asian Metal Copyright The first planning capacity will reach 500,000 new energy vehicles and related supporting projects, and the output value of vehicle and parts manufacturing will exceed RMB100 billion when it reaches design capacity.
    .Asian Metal Copyright The first planning capacity will reach 500,000 new energy vehicles and related supporting projects, and the output value of vehicle and parts manufacturing will exceed RMB100 billion when it reaches design capacityAsian Metal Copyright
    Lithium Hydroxide Monohydrate LiOH 56.5%min Delivered China
    Unit:RMB/mt
    China lithium carbonate 99%min producers' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.