• Ferro-manganese Mn 65%min, C 7%max EXW China(200)  04-30|Ferro-manganese Mn 75%min, C 8%max EXW China(200)  04-30|Silico-manganese 65/17 EXW China(200)  04-30|Copper Conc. TC 25%min CIF China(-1)  04-30|Zinc Conc. 50%min EXW North China(480)  04-30|Ferro-silicon 75%min EXW China(200)  04-30|Zinc Conc. 50%min EXW South China(480)  04-30|Selenium Powder 99.9%min Delivered India(50)  04-30|Ferro-chrome Cr 60%min, C 8%max In warehouse Pittsburg(-0.05)  04-30|Zinc Ingot 99.99%min EXW China (600)  04-30|Zinc Ingot 99.995%min In warehouse Tianjin(600)  04-30|Zinc Ingot 99.995%min In warehouse Shanghai(600)  04-30|Zinc Ingot 99.995%min In warehouse Guangzhou(600)  04-30|Ferro-manganese Mn 75%min, C 2%max EXW China(200)  04-30
  • Masteel's Q1 molten iron output exceeds guidance

    2024-04-12 11:41:16   [Print]
    In the first quarter of 2024, Masteel's iron-making plant produced 3,823,200 tonnes of molten iron, which exceeded guidance.Asian Metal Copyright The plant's blast furnace A produced 319,200 tonnes of molten iron in March, once again hitting a new high.Asian Metal Copyright The plant's blast furnace (A) produced 319,200 tonnes of molten iron in March, once again hitting a new high.
    .Asian Metal Copyright The plant's blast furnace A produced 319,200 tonnes of molten iron in March, once again hitting a new highAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.