Longling Minda to build 150ktpa silicon metal granule project
2024-03-26 12:00:20 [Print]
The 150,000tpa silicon metal granule project developed by Longling Minda Technology Industry Co
With a total investment of RMB356 million (USD49.32 million), the project will be located in Longling, Yunnan and construction mainly includes a production line with annual capacity of 150,000t of silicon metal granule, two silicon powder rotary melting furnaces, with a total floor area of 31,000 square meters, as well as other associated facilities . The project is scheduled to complete construction in June 2025.
. , Ltd . has been put on record by local authority.With a total investment of RMB356 million (USD49.32 million), the project will be located in Longling, Yunnan and construction mainly includes a production line with annual capacity of 150,000t of silicon metal granule, two silicon powder rotary melting furnaces, with a total floor area of 31,000 square meters, as well as other associated facilities . The project is scheduled to complete construction in June 2025.