• Manganese Ore S.A. 36%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 36%min In Tianjin Port(2)  04-26|Manganese Ore S.A. 37%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 37%min In Tianjin Port(2)  04-26|Manganese Ore Brazilian 44%min In Qinzhou Port(2.1)  04-26|Manganese Ore Brazilian 44%min In Tianjin Port(2.1)  04-26|Manganese Ore Gabonese 44%min In Tianjin Port(1.9)  04-26|Manganese Ore Gabonese 44%min In Qinzhou Port(1.9)  04-26|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  04-26|Manganese Ore Australian 45%min In Tianjin Port(1.8)  04-26|Silicon Metal 98.5%min Delivered US(0.04)  04-26|Copper Conc. TC 25%min CIF China(-1)  04-26|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-26|Zinc Conc. TC 50% CIF China(-1.5)  04-26
  • China Coal to build world-class modern coal chemical industry demonstration zone in Ordos

    2023-05-24 16:15:51   [Print]
    China National Coal Group Corporation (China Coal) plans to build a modern world-class coal chemical industry demonstration zone in Tuke Town, Wushen Banner, Ordos with a total investment of hundreds of billions of yuan.Asian Metal Copyright3 billion US dollars on the basis of 2027, including 80 billion yuan 11.Asian Metal Copyright According to the plan, by 2027, about 100 billion yuan (14.Asian Metal Copyright88 billion US dollars, among which 60 billion yuan 8.Asian Metal Copyright2 billion US dollars) will be invested in the park, and about 40 billion yuan (5.Asian Metal Copyright3 billion US dollars on the basis of 2027, including 80 billion yuan 11.Asian Metal Copyright68 billion US dollars) will be invested in supporting new energy around the park, with a total investment of about 140 billion yuan (19.Asian Metal Copyright52 billion US dollars comes from China Coal.Asian Metal Copyright88 billion US dollars), among which 60 billion yuan (8.Asian Metal Copyright88 billion US dollars, among which 60 billion yuan 8.Asian Metal Copyright52 billion US dollars) comes from China Coal.Asian Metal Copyright68 billion US dollars will be invested in supporting new energy around the park, with a total investment of about 140 billion yuan 19.Asian Metal Copyright The output value of the park will reach 58 billion yuan (8.Asian Metal Copyright3 billion US dollars on the basis of 2027, including 80 billion yuan 11.Asian Metal Copyright24 billion US dollars), and the economic aggregate of the park will be doubled.Asian Metal Copyright2 billion US dollars will be invested in the park, and about 40 billion yuan 5.Asian Metal Copyright By 2030, major progress will be made in the construction of the key core area of the zone, with an additional investment of about 150 billion yuan (21.Asian Metal Copyright The output value of the park will reach 58 billion yuan 8.Asian Metal Copyright3 billion US dollars) on the basis of 2027, including 80 billion yuan (11.Asian Metal Copyright52 billion US dollars comes from China Coal.Asian Metal Copyright36 billion US dollars) from China Coal, and the output value of the zone will exceed 100 billion yuan (14.Asian Metal Copyright88 billion US dollars, among which 60 billion yuan 8.Asian Metal Copyright2 billion US dollars).Asian Metal Copyright88 billion US dollars, among which 60 billion yuan 8.Asian Metal Copyright By 2035, China Coal will fully implement the Tuke model of coal, featuring mutual supply of raw materials, fast and improved logistics, centralized supply of supporting materials, unified waste treatment, unified and standardized management, and comprehensive utilization of resources, and complete the construction of the key core area of the zone.
    .Asian Metal Copyright88 billion US dollars, among which 60 billion yuan 8Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.