• Manganese Ore S.A. 36%min In Qinzhou Port(2.5)  04-28|Manganese Ore S.A. 36%min In Tianjin Port(2.5)  04-28|Manganese Ore S.A. 37%min In Qinzhou Port(2.5)  04-28|Manganese Ore S.A. 37%min In Tianjin Port(2.5)  04-28|Manganese Ore Gabonese 44%min In Tianjin Port(2.5)  04-28|Manganese Ore Australian 45%min In Qinzhou Port(2.5)  04-28|Manganese Ore Gabonese 44%min In Qinzhou Port(2.5)  04-28|Manganese Ore Australian 45%min In Tianjin Port(2.5)  04-28|Manganese Ore Brazilian 44%min In Tianjin Port(2.5)  04-28|Manganese Ore Brazilian 44%min In Qinzhou Port(1.5)  04-28|Manganese Ore Carbonate, Mn 13%min EXW China(1)  04-28|Selenium Powder 99.9%min Delivered India(50)  04-28|Met. Coke A 13%max, S 0.7%max EXW Shanxi(50)  04-28|Copper Conc. TC 25%min CIF China(-1)  04-28
  • CNMC Zhengyuan's 60,000tpy lithium battery cathode material precursor project goes into construction

    2023-03-30 17:44:37   [Print]
    CNMC Zhengyuan's 60,000tpy lithium battery cathode material precursor project formally went into construction on March 28th in the Eastern Industrial Park of Tongling Economic Development District.

    CNMC Zhengyuan is a joint venture of China Nonferrous Metal Mining (Group) Co., Ltd.Asian Metal Copyright and XTC New Energy and its 60,000tpy lithium battery cathode material precursor project is divided into three phases in construction with a total investment of RMB10 billion USD1.Asian Metal Copyright and XTC New Energy and its 60,000tpy lithium battery cathode material precursor project is divided into three phases in construction with a total investment of RMB10 billion (USD1.Asian Metal Copyright, Ltd.Asian Metal Copyright45 billion).Asian Metal Copyright45 billion.Asian Metal Copyright In particular, the project will build four cobalt tetroxide production lines and eight NCM precursor production lines in phase one and phase two respectively with a total production capacity of 60,000tpy.Asian Metal Copyright CNMC Zhengyuan is a joint venture of China Nonferrous Metal Mining Group Co.Asian Metal Copyright After putting the first two phases into operation, the project will gradually launch the construction of the phase three, which will add several production lines for both tetroxide and NCM precursor.


    .Asian Metal Copyright After putting the first two phases into operation, the project will gradually launch the construction of the phase three, which will add several production lines for both tetroxide and NCM precursorAsian Metal Copyright
    Nickel Cathode 99.96%min EXW China
    Unit:RMB/mt
    China nickel sulfate producers' sales volume statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.