• Copper Conc. TC 25%min CIF China(-1)  05-14|Antimony Ingot 99.85%min EXW China(3000)  05-14|Tungsten Powder 99.95%min 2.5-7.0μm EXW China(9)  05-14|Ethylene Glycol Antimony 57%min Delivered China(2000)  05-14|Tin Conc. Burmese 20%min In warehouse MengA(6000)  05-14|Tin Conc. Burmese 30%min In warehouse MengA(6000)  05-14|Antimony Trioxide 99.5%min Delivered China(2500)  05-14|Zinc Conc. TC 50% CIF China(-1.2)  05-14|Vanadium Pentoxide Powder 98%min EXW China(2000)  05-14|Tin Conc. 60%min Delivered China(6000)  05-14|Antimony Trioxide 99.5%min In warehouse Baltimore(0.15)  05-14|Fused Alumina Brown 95%min 1-3mm In warehouse Rotterdam(20)  05-14|Rhenium APR 99.99%min EXW China(100)  05-14|Tungsten Bar W-4 99.9%min EXW China(8)  05-14
  • Henan Stainless Steel High-quality Material Industrial Town project settles in Xuchang

    2023-01-13 16:52:46   [Print]
    On the morning of January 11, Changge Economic Development Zone held the signing ceremony of the memorandum of understanding of Henan Stainless Steel High-quality Materials Industrial Town project.Asian Metal CopyrightOn the morning of January 11, Changge Economic Development Zone held the signing ceremony of the memorandum of understanding of Henan Stainless Steel High-quality Materials Industrial Town project.Asian Metal Copyright This project is a major project in the development planning of circular economy industry, and also the first ten-billion-level project in Changge City and even Xuchang City.Asian Metal Copyright After completion, the overall capacity of Jinhui Industrial Group can reach 3 million tons.Asian Metal Copyright With a total investment of RMB12 billion (USD1.Asian Metal Copyright This project is a major project in the development planning of circular economy industry, and also the first ten-billion-level project in Changge City and even Xuchang City.Asian Metal Copyright78 billion) and an area of 247 acres, the project is planned to start construction in June 2023 and be put into operation at the end of December 2027.Asian Metal Copyright This project is a major project in the development planning of circular economy industry, and also the first ten-billion-level project in Changge City and even Xuchang City.Asian Metal Copyright After completion, the overall capacity of Jinhui Industrial Group can reach 3 million tons.
    .Asian Metal Copyright After completion, the overall capacity of Jinhui Industrial Group can reach 3 million tonsAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.