• Copper Cathode 99.99%min Delivered China(4300)  05-20|Copper Conc. 20%min Delivered China(4000)  05-20|Copper Scrap Wire 99%min Delivered China(4000)  05-20|Copper Conc. TC 25%min CIF China(-1)  05-20|Antimony Ingot 99.65%min EXW China(4500)  05-20|Antimony Ingot 99.85%min EXW China(4500)  05-20|Antimony Conc. 50%min Delivered China(3500)  05-20|Antimony Trioxide 99.5%min Delivered China(3500)  05-20|Antimony Trioxide 99.8%min Delivered China(3500)  05-20|Tin Conc. Burmese 20%min In warehouse MengA(7000)  05-20|Indium Ingot 99.995%min Delivered US(8)  05-20|Nickel Cathode 99.96%min EXW China(4500)  05-20|Nickel Cathode Norilsk 99.96%min In port China(4400)  05-20|Tin Conc. Burmese 30%min In warehouse MengA(7000)  05-20
  • Shanxi achieves annual coal output goal of 1.3 billion tons ahead of schedule

    2022-12-28 14:06:33   [Print]
    As of December 27, Shanxi had fulfilled its annual coal production target of 1.Asian Metal Copyright3 billion tons ahead of schedule, ranking first in China in coal production and achieving an average annual increase of over 100 million tons for two consecutive years.Asian Metal Copyright3 billion tons ahead of schedule, ranking first in China in coal production and achieving an average  annual increase of over 100 million tons for two consecutive years.
    .Asian Metal CopyrightAs of December 27, Shanxi had fulfilled its annual coal production target of 1Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.