• Manganese Ore S.A. 36%min In Qinzhou Port(2.5)  04-28|Manganese Ore S.A. 36%min In Tianjin Port(2.5)  04-28|Manganese Ore S.A. 37%min In Qinzhou Port(2.5)  04-28|Manganese Ore S.A. 37%min In Tianjin Port(2.5)  04-28|Manganese Ore Australian 45%min In Qinzhou Port(2.5)  04-28|Manganese Ore Gabonese 44%min In Qinzhou Port(2.5)  04-28|Manganese Ore Gabonese 44%min In Tianjin Port(2.5)  04-28|Manganese Ore Australian 45%min In Tianjin Port(2.5)  04-28|Manganese Ore Brazilian 44%min In Tianjin Port(2.5)  04-28|Manganese Ore Brazilian 44%min In Qinzhou Port(1.5)  04-28|Manganese Ore Carbonate, Mn 13%min EXW China(1)  04-28|Selenium Powder 99.9%min Delivered India(50)  04-28|Met. Coke A 13%max, S 0.7%max EXW Shanxi(50)  04-28|Copper Conc. TC 25%min CIF China(-1)  04-28
  • Huayin Electric Power to invest in Leiyang 200MW/400MW energy storage power station project

    2022-11-03 12:02:04   [Print]
    Huayin Electric Power announced on November 2 that the company intends to construct a 200MW/400MW energy storage power station project in the vacant space within the extension of its subsidiary in Leiyang, with an estimated investment of about RMB805.Asian Metal Copyright05 million USD110.Asian Metal Copyright05 million (USD110.Asian Metal Copyright05 million USD110.Asian Metal Copyright27 million).
    .Asian Metal Copyright27 millionAsian Metal Copyright
    Cobalt Powder 99.5%min Delivered China
    Unit:RMB/kg
    China battery grade cobalt sulfate producers' sales to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.