• Manganese Ore S.A. 36%min In Qinzhou Port(2.5)  04-28|Manganese Ore S.A. 36%min In Tianjin Port(2.5)  04-28|Manganese Ore S.A. 37%min In Qinzhou Port(2.5)  04-28|Manganese Ore S.A. 37%min In Tianjin Port(2.5)  04-28|Manganese Ore Gabonese 44%min In Tianjin Port(2.5)  04-28|Manganese Ore Australian 45%min In Qinzhou Port(2.5)  04-28|Manganese Ore Gabonese 44%min In Qinzhou Port(2.5)  04-28|Manganese Ore Australian 45%min In Tianjin Port(2.5)  04-28|Manganese Ore Brazilian 44%min In Tianjin Port(2.5)  04-28|Manganese Ore Brazilian 44%min In Qinzhou Port(1.5)  04-28|Manganese Ore Carbonate, Mn 13%min EXW China(1)  04-28|Selenium Powder 99.9%min Delivered India(50)  04-28|Met. Coke A 13%max, S 0.7%max EXW Shanxi(50)  04-28|Copper Conc. TC 25%min CIF China(-1)  04-28
  • GalaxyCore puts into operation 12-inch CIS integrated circuit technology development and industrialization project

    2022-09-05 15:36:22   [Print]
    On September 2, GalaxyCore announced that the BSI production line of its 12-inch CIS integrated circuit technology development and industrialization project successfully produced first batch of round silicon wafer products, with the qualification rate reaching 95%.Asian Metal Copyright This means that the BSI production line is ready for large-scale mass production.Asian Metal Copyright This means that the BSI production line is ready for large-scale mass production.

    .Asian Metal CopyrightOn September 2, GalaxyCore announced that the BSI production line of its 12-inch CIS integrated circuit technology development and industrialization project successfully produced first batch of round silicon wafer products, with the qualification rate reaching 95%Asian Metal Copyright
    Silicon Metal 5-5-3 Ex-VAT FOB China
    Unit:USD/mt
    China silicon metal producers' sales to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.