• Erbium Oxide 99.5%min EXW China(9)  04-29|Copper Conc. TC 25%min CIF China(-1)  04-29|Selenium Powder 99.9%min Delivered India(50)  04-29|Met. Coke A 13%max, S 0.7%max EXW Shanxi(50)  04-29|Arsenic Metal 99.9999%min Delivered China(-7)  04-29|Silicon Metal 98.5%min Delivered US(0.04)  04-29|Ferro-chrome Cr 60%min, C 8%max In warehouse Pittsburg(-0.05)  04-29|Met. Coke A 13%max, S 0.7%max EXW Hebei(50)  04-29|Met. Coke A 13%max, S 0.7%max EXW Shandong(50)  04-29|Zinc Conc. TC 50% CIF China(-1.5)  04-29|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-29|Ferro-chrome Cr 60%min, C 8%max In warehouse Rotterdam(-0.04)  04-29|Ferro-tungsten 75%min In warehouse Rotterdam(1)  04-29|Ferro-tungsten 75%min FOB Russia(1)  04-29
  • KBC to build 10,000tpy integrated demonstration line for toner used in lithium-ion battery anode material field

    2022-08-05 14:48:44   [Print]
    KBS announced on August 4th that it will build a 10,000tpy integrated demonstration line for toner used in lithium-ion battery anode material field with a total investment of no more than RMB281 million (USD41.Asian Metal Copyright .Asian Metal Copyright65 million).Asian Metal Copyright The project is expected to start building in August 2022 and realize full production in August 2023 with a building period of one year.Asian Metal Copyright The project is expected to start building in August 2022 and realize full production in August 2023 with a building period of one year.


    .Asian Metal Copyright65 millionAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.