• Manganese Ore S.A. 36%min In Qinzhou Port(2.5)  04-28|Manganese Ore S.A. 36%min In Tianjin Port(2.5)  04-28|Manganese Ore S.A. 37%min In Qinzhou Port(2.5)  04-28|Manganese Ore S.A. 37%min In Tianjin Port(2.5)  04-28|Manganese Ore Australian 45%min In Qinzhou Port(2.5)  04-28|Manganese Ore Gabonese 44%min In Qinzhou Port(2.5)  04-28|Manganese Ore Gabonese 44%min In Tianjin Port(2.5)  04-28|Manganese Ore Australian 45%min In Tianjin Port(2.5)  04-28|Manganese Ore Brazilian 44%min In Tianjin Port(2.5)  04-28|Manganese Ore Brazilian 44%min In Qinzhou Port(1.5)  04-28|Manganese Ore Carbonate, Mn 13%min EXW China(1)  04-28|Selenium Powder 99.9%min Delivered India(50)  04-28|Met. Coke A 13%max, S 0.7%max EXW Shanxi(50)  04-28|Copper Conc. TC 25%min CIF China(-1)  04-28
  • Yushujing Coal Mine of Inner Mongolia approved to increase annual production capacity to 3.8 million tons

    2022-04-22 16:50:08   [Print]
    According to Bureau of Energy of Otog Front Banner, Inner Mongolia, on April 16 Yushujing Coal Mine was approved by Bureau of Energy of Inner Mongolia to increase its annual production capacity from the current 3 million tons to 3.Asian Metal Copyright8 million tons.Asian Metal Copyright8 million tons.

    .Asian Metal CopyrightAccording to Bureau of Energy of Otog Front Banner, Inner Mongolia, on April 16 Yushujing Coal Mine was approved by Bureau of Energy of Inner Mongolia to increase its annual production capacity from the current 3 million tons to 3Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.